Question # 84

Which of the following is the most important task of a typical test leader?

Options:

A.

To automate tests.

B.

To prepare and acquire test data.

C.

To set up the test environment.

D.

To coordinate the test strategy with project managers.

Buy Now
Question # 85

Which one of the following statements relating to the benefits of static testing is NOT correct?

Options:

A.

Static testing enables early detection of defects before dynamic testing is performed.

B.

Static testing reduces testing costs and time.

C.

Static testing increases development costs and time.

D.

Static testing identifies defects which are not easily found by dynamic testing.

Buy Now
Question # 86

A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?

Options:

A.

Get familiar with the functionality and options of the tool

B.

Check haw the tool fits to the existing test processes

C.

Train all testers on using the tool

D.

Decide upon standards for tool implementation

Buy Now
Question # 87

Which of the following is true about Oracles?

Options:

A.

Sometimes old version of a product can be used as an Oracle

B.

Oracles help in reproducing the irreproducible bugs

C.

Oracles are derived from the design

D.

Oracles can be generated automatically using data generators

Buy Now
Question # 88

Given the following examples of entry and exit criteria:

1.A defined level of code coverage has been achieved

2.The test automation tool has been installed and properly configured

3.The number of unresolved defects is within the predefined limit

4.The performance test environment has been set-up and is available

5.The user stories have proper acceptance criteria defined

6.The testing budget has been spent and the project sponsor bears the risk of not testing any further

Which of the following BEST categorizes them as entry and exit criteria:

Options:

A.

Entry criteria - 2, 4, 5 Entry criteria -1, 3, 4

B.

Entry criteria - 2, 4 Entry criteria - 2, 4, 5, 6

C.

Exit criteria -1,3,6 Exit criteria - 2, 5. 6

D.

Exit criteria -1,3,56 Exit criteria -1,3

Buy Now
Question # 89

In a review, which of the following is the responsibility of the manager?

Options:

A.

Performing detailed review based on past experience

B.

Ensuring that sufficient time is available for review

C.

Measuring the performance of each reviewer

D.

Organizing the logistics of the review meeting

Buy Now
Question # 90

From a testing perspective, configuration management

Options:

A.

Allows the expected results to be compared with the actual results.

B.

Allows the tracking of all changes to versions of the testware.

C.

Includes all activities that direct and control an organisation with regard to quality

D.

Focuses on configuring static analysis tools to choose the most suitable breadth and depth of analysis.

Buy Now
Question # 91

What does the "absence-of-defects fallacy" refer to in software development?

Options:

A.

A misconception that software verification is unnecessary

B.

The idea that fixing defects is NOT important to meeting user needs.

C.

The belief that thoroughly testing all requirements guarantees system success.

D.

The need for constant system quality assurance and improvements.

Buy Now
Question # 92

The following open incident report provided:

Date: 01.01.01

Description: When pressing the stop button the application status remain in "Attention" instead of "Ready'.

Severity: High

Life Cycle: Integration

Which of the following details are missing in the giving incident report?

I. Identification or configuration of the application

II. The name of the developer

III. Recommendation of the developer

IV The actions and/or conditions that came before the pressing of the button

Options:

A.

IV

B.

I. IV

C.

I. II

D.

II, III

Buy Now
Question # 93

Which of the following statements about the shift-left approach is FALSE?

Options:

A.

The shift-left approach can only be implemented with test automation

B.

The shift-left approach in testing is compatible with DevOps practices.

C.

The shift-left approach can involve security vulnerabilities

D.

The shift-left approach can be supported by static analysis tools.

Buy Now
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL v4.0)
Last Update: Nov 13, 2025
Questions: 406
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$25.5  $84.99
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$28.5  $94.99
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$40.5  $134.99