Question # 44

Which of the statements correctly describes when a whole team approach may NOT be suitable?

Options:

A.

When a high level of test independence may be required.

B.

When acceptance tests need to be created.

C.

When a test automation approach needs to be determined.

D.

When the team dynamics need to be improved.

Buy Now
Question # 45

A system computes prices for bus tickets. The price depends on

- the passenger type (baby, child, adult, senior citizen, student, military)

- the travelling type (as single or in a group)

- the distance (zone 1. 2. 3)

- the kind of transport (ordinary, express)

Which of the following test techniques is the most appropriate one for testing the price computation?

Options:

A.

Statement coverage

B.

State transition testing

C.

Equivalence partitioning

D.

Use case testing

Buy Now
Question # 46

The following incident report that was generated during test of a web application.

What would you suggest as the most important report improvement?

Defect detected date: 15 8.2010

Defect detected by: Joe Smith

Test level System test

Test case: Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1, t click ENTER to continue to screen 2 Nothing happens, no system response at all.

Options:

A.

Add information about which web browser was used

B.

Add information about which developer should fix the bug

C.

Add the time stamp when the incident happened

D.

Add an impact analysis

Buy Now
Question # 47

Which of the following is an example of black-box dynamic testing?

Options:

A.

Functional Testing

B.

Code inspection

C.

Checking memory leaks for a program by executing it

D.

Coverage analysis

Buy Now
Question # 48

An Incident Management tool implements the following defect states; Open, Assigned, Solved,

Closed Consider the following defect report:

Id T000561

Test Object "Warehouse Management' application

Tester name; John Bishop

Date: 10th. April 2010

Test Case MRT558I

Status OPEN

Severity Serious

Priority

Problem- After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected Error message=47

Correction:

Developer name:

Closing date:

Which of the following is a valid criticism of this report?

Options:

A.

The Priority, the Correction description and the Developer name are missing

B.

The version of the application is missing

C.

There is no link to the applicable requirement (traceability)

D.

The description is not highlighting the source of the problem

Buy Now
Question # 49

ON NO: 94

Which ONE of the following statements does NOT describe how testing contributes to higher quality?

Options:

A.

Properly designed tests that pass reduce the level of risk in a system.

B.

The testing of software demonstrates the absence of defects.

C.

Software testing identifies defects, which can be used to improve development activities.

D.

Performing a review of the requirement specifications before implementing the system can enhance quality.

Buy Now
Question # 50

Which of the following is a typical potential risk of using test automation tools?

Options:

A.

Reduced feedback times regarding software quality compared to manual testing.

B.

Reduced test execution limes compared to manual testing.

C.

Reduced repeatability and consistency of tests compared to manual testing

D.

Underestimation of effort required to maintain test scripts.

Buy Now
Question # 51

Decision table testing is being performed on tran-sactions in a bank’s ATM (Automated Teller Machine) system. Two test cases have already been generated for rules 1 and 4. which are shown below:

SEE ATTACHMENT 1

Given the following additional test cases:

SEE ATTACHMENT 2

Which two of the additional test cases would achieve full coverage of the full decision table (when combined with the test cases that have already been generated for rules 1 and 4)?

Options:

A.

DT1, DT4

B.

DT3, DT4

C.

DT2, DT3

D.

DT1.DT2

Buy Now
Question # 52

Which of the following is a function of a dynamic analysis tool?

Options:

A.

Provide support for traceability of tests, test results and incidents to source documents

B.

Monitor the allocation, use and de-allocation of memory during run-time of a program

C.

Execute programs step-by-step in order to reproduce failures and find corresponding defects

D.

Provide support for release of baselines consisting of configuration items

Buy Now
Question # 53

Which ONE of the following statements about state transition testing is correct?

Options:

A.

The state transition diagram explicitly shows all invalid transitions.

B.

The size of the state table depends on the number of possible transitions between the states

C.

Usually it is not possible to create tests to cover ell transitions and all stales

D.

All transitions between states are explicitly shown in the state table.

Buy Now
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL) v4.0
Last Update: Feb 23, 2025
Questions: 288
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$25.5  $84.99
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$28.5  $94.99
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$40.5  $134.99