Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

ISTQB-CTFL Exam Dumps - ISTQB Foundation Level Questions and Answers

Question # 74

Which or the following is a valid collection of equivalence classes for the following problem: An integer field shall contain values from and including 1 to and including 15.

Options:

A.

Less than 0.1 through 14. 15 and more

B.

Less than 1.1 through 14. more than 15

C.

negative numbers. 1 through 15. above 15

D.

Less than 1.1 through 15. more than 15

Buy Now
Question # 75

Which of the following statements about independent testing is WRONG?

Options:

A.

Independent testing is necessary because developers don't know any testing.

B.

Independent testing is best suited for the system test level.

C.

A certain degree of independence makes the tester more effective at finding defects.

D.

Independent test teams may find other types of detects than developers who are familiar with the system's structure.

Buy Now
Question # 76

A test engineer finds a defect while testing. After the developer has fixed the defect, the test engineer decides to re-run a complete section of the tests. Which of the following is correct?

Options:

A.

The lest engineer should not re-run the tests, as they have already been run, and results recorded.

B.

The test engineer should not re-run the tests, they should be part of the developer tests.

C.

The test engineer should re-run the tests, in order to ensure that new defects have not been introduced by the fix.

D.

The test engineer should re-run the tests, because the defect shows that the test cases need to be updated.

Buy Now
Question # 77

Given the following examples of entry and exit criteria:

1.A defined level of code coverage has been achieved

2.The test automation tool has been installed and properly configured

3.The number of unresolved defects is within the predefined limit

4.The performance test environment has been set-up and is available

5.The user stories have proper acceptance criteria defined

6.The testing budget has been spent and the project sponsor bears the risk of not testing any further

Which of the following BEST categorizes them as entry and exit criteria:

Options:

A.

Entry criteria - 2, 4, 5Entry criteria -1, 3, 4

B.

Entry criteria - 2, 4 Entry criteria - 2, 4, 5, 6

C.

Exit criteria -1,3,6Exit criteria - 2, 5. 6

D.

Exit criteria -1,3,56Exit criteria -1,3

Buy Now
Question # 78

Which of the following is an INCORRECT statement about the benefit of traceability between the test basis and test work products?

Options:

A.

Traceability may be required by IT governance rules

B.

Traceability may help evaluate the extent of test coverage

C.

Traceability may allow testing to be auditable

D.

Traceability may make it harder to understand the impact of changes

Buy Now
Question # 79

Which of the following are valid testing principles?

I) Exhaustive testing is in general impossible.

II) Exhaustive testing should be executed for code intended to be reused.

III) Testing may guarantee that a program is correct.

IV) Testing cannot guarantee that a program is correct.

V) Defects cluster together in certain areas of the product.

Options:

A.

I, IV, V

B.

II,Iv

C.

I, V

D.

I, Ill

Buy Now
Question # 80

A virtual service emulating a real third-party service and the automated test scripts (aimed at testing the system under test) that interact with that service, are test work products that are typically created during:

Options:

A.

Test monitoring and control

B.

Test implementation

C.

Test design

D.

Test analysis

Buy Now
Question # 81

Which statement best describes the key difference between a mindset for test activities and a mindset for development activities?

Options:

A.

A tester possesses professional pessimism while a developer is concerned with validating the product

B.

A tester is concerned with finding defects while a developer is interested in designing solutions

C.

A tester is interested in building solutions while a developer is concerned with verifying the product

D.

A tester is concerned with verifying the product while a developer possesses professional pessimism

Buy Now
Question # 82

Which of the following project scenario gives the BEST example where maintenance testing should be triggered?

Options:

A.

Completion of architecture of the bank system

B.

Release of the early draft of the low level project design of an loT application

C.

Defect was found in a pre-released version of the customer service application

D.

Delivery of the hot fix to mobile operating system and ensuring that it still works

Buy Now
Question # 83

Which of the following is the BEST reason for selecting a particular type of software development lifecycle model?

Options:

A.

The project manager's preference

B.

Tester skill level with the software development lifecycle model

C.

The project team's overall familiarity with the model

D.

The type of product being developed

Buy Now
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL v4.0)
Last Update: Apr 3, 2025
Questions: 328
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$25.5  $84.99
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$28.5  $94.99
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$40.5  $134.99