New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

PDF Development-Lifecycle-and-Deployment-Architect Study Guide

Page: 5 / 16
Question 20

Universal Containers (UC) is considering updating their Salesforce Release Management process. Which three best practices should UC consider for Release Management? Choose 3 answers

Options:

A.

Design the right sandbox strategy for the release.

B.

Release sign-off is only required for Production.

C.

Regression testing is mandatory for each release.

D.

Maintain a pre/post deployment checklist for each release.

E.

Publish a release calendar for each phase of the release.

Question 21

A year has passed since a project has gone live and a developer is looking to make an update to an existing Apex class, but is unsure of its purpose. What artifact from the original project should be leveraged to determine the purpose of the class?

Options:

A.

User Acceptance Test Scripts

B.

Test Execution Plan

C.

Requirements Traceability Matrix

D.

Test Sign Off Document

Question 22

Universal Containers is working on the next phase of development for their Salesforce implementation involving a large amount of custom development. Which two strategies should be considered to address a critical production issue occurring in the middle of development? Choose 2 answers

Options:

A.

Create separate branches for current development and production bug fixes and deploy the fix with current development when ready

B.

Utilize one branch for both development and production bug fixes to avoid out-of-sync branches and simplify deployment

C.

Utilize a source control system to allow separate branches for current development and production bug fixes

D.

Refresh a sandbox for replication of the issue and testing the use -case scenarios once the code is fixed

Question 23

Which two project situations favor a waterfall methodology? Choose 2 answers

Options:

A.

An application with many systems and inter-dependencies between components.

B.

An application with regulatory compliance requirements to be validated by outside agencies.

C.

An application in post-production, with incremental changes made by a small team.

D.

An in-house application with a fixed team size, but an open timeline and flexible requirements.

Page: 5 / 16
Exam Name: Salesforce Certified Development Lifecycle and Deployment Architect (SU24)
Last Update: Dec 22, 2024
Questions: 225
Development-Lifecycle-and-Deployment-Architect pdf

Development-Lifecycle-and-Deployment-Architect PDF

$25.5  $84.99
Development-Lifecycle-and-Deployment-Architect Engine

Development-Lifecycle-and-Deployment-Architect Testing Engine

$28.5  $94.99
Development-Lifecycle-and-Deployment-Architect PDF + Engine

Development-Lifecycle-and-Deployment-Architect PDF + Testing Engine

$40.5  $134.99