A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B.
The customer then runs the following command on Site A:
ncli pd deactivate_and__destroy_vms name=
What does this do to the customer environment?
Which two components are required to validate and Foundation a cluster with ESXi as the hypervisor? (Choose two.)
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?
A consultant successfully creates a Nutanix cluster. The consultant needs to configure containers for the customers business critical applications and general server workloads. The customer requirements are to achieve maximum storage space savings and optimize
I/O performance.
What setting(s) should the consultant enable on the storage container(s)?