A consultant is running operational verifications to validate cluster behaviors
What will happen if one power supply is disconnected from a NX-3235-G9 chassis?
A Nutanix cluster has 10TB usable storage. The customer wants to create a 100GB datastore for ISO images to eliminate too much storage being consumed by unnecessary images.
Which setting should be used to accomplish this goal?
A consultant is setting up a new vSphere cluster. Customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available
Which two settings should be turned on to meet the requirements? (Choose two.)
A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?
A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.
Which method can be used to successfully add the node?
A consultant has been tasked with increasing security on a Nutanix cluster by disabling password authentication when accessing the CVM and AHV hosts and instead moving to key-based SSH.
What is the easiest way for the consultant to meet these requirements?
A consultant is onsite and needs to start their Foundation Virtual Machine (FVM) to image Nutanix hardware. The FVM fails to boot. The consultant decides to use a different Foundation method.
Assuming the nodes will discover, which Foundation type or configuration option should the consultant select?
While reviewing the BOM during the kickoff call, a consultant notices that there are six NX nodes and 12 SFP+ modules, but no fiber cables are listed.
Which statement is correct regarding this scenario?
An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.
Which two steps should be taken to prepare for this task? (Choose two.)
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?