Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

NCS-Core Exam Dumps - Nutanix NCS Professional Questions and Answers

Question # 84

After reviewing the questionnaire provided by a customer, the consultant is completing the Foundation Configuration on the Nutanix website. According to the customer requirements, the cluster should be prepared off site in a safe room, and moved afterwards to the datacenter.

Which configuration should the consultant implement on the Foundation VM?

Options:

A.

Add « virtual switch dedicated to the IPMI network.

B.

Prepare multi-homing with two IP addresses.

C.

another physical laptop port to the Foundation VM.

D.

Create a firewall rule blocking customer subnets.

Buy Now
Question # 85

The customer notices storage latency issues with their new Nutanix AHW cluster. The deployment includes the following components:

◦ 2 ToR switches

◦ 7 nodes

Which command should the consultant run to identify issues?

Options:

A.

manage_ovs show bridges

B.

manage_ovs show_interfaces

C.

manage_ovs show_11dp

D.

manage_ovs show_uplinks

Buy Now
Question # 86

A consultant is planning a new cluster installation and needs to locate the Shared IPMI port for each of the specific nodes that the customer has bought.

Which Support Portal location contains the document that would identify the port?

Options:

A.

Solutions Documentation

B.

Hardware Replacement Documentation

C.

Software Documentation

D.

Knowledge Base

Buy Now
Question # 87

A consultant is not able to run the As-Built Tool for a technical reason.

What action should the consultant take to gather information and provide customer documentation?

Options:

A.

Manually create documentation using As-Built document template.

B.

Use RVTools for vSphere and Hyper-V deployments.

C.

Create a support case on behalf of a customer.

D.

Access portal.nutanix.com, search Software Documentation.

Buy Now
Question # 88

An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs.

What are two impacts on the cluster? (Choose two.)

Options:

A.

Increase CPU utilization%

B.

Increase CPU ready%

C.

Increase memory utilization%

D.

Increasing CPU counts will decrease memory utilization

Buy Now
Question # 89

A customer has Metro Availability configured in Automatic Resume Mode between Site A and Site B What happens to VMs if Primary Site A has full network failure?

Options:

A.

Automatic protection domain promotion in Site B. VMs automatically restart in Site B

B.

VMs continue to run on Site A following an automatic disable of protection domains.

C.

An administrator must unwitness in Site B and promote protection domains in Site B for VMs to restart

D.

An administrator must promote protection domains in Site B for VMs to restart.

Buy Now
Question # 90

A consultant wants to expand a Nutanix cluster based on Dell PowerEdge servers and notices the nodes have arrived software-less.

Which two actions should the consultant take to expand the cluster? (Choose two.)

Options:

A.

Image nodes using Foundation VM/App.

B.

Use Expand cluster to expand duster.

C.

Return nodes to factory for imaging.

D.

Use Expand cluster to image the nodes.

Buy Now
Question # 91

A consultant notices while assigning VLAN tags to hosts and CVMs in a running cluster, that Prism Element displays alerts indicating a node is down.

What should the consultant do to prevent these alerts?

Options:

A.

Restart the Nutanix cluster.

B.

Only change the Controller Virtual Machine VLANs.

C.

Only change the hypervisor VLANs.

D.

Stop the Nutanix cluster before changing VLANs.

Buy Now
Question # 92

To prepare for a new Nutanix installation, a consultant downloads the Foundation VM, imports the VM to their Desktop Virtualization Solution, and powers on the VM. The IPv4 static address on the host workstation and the Foundation VM have been configured, but pings between them fail.

Which two troubleshooting steps should the consultant perform? (Choose two.)

Options:

A.

Remove and re-import the Foundation VM to ensure the virtual NIC is set to Host-Only.

B.

Verify the virtual NIC in the Foundation VM is bound to the correct physical Host adapter.

C.

Confirm the IP addresses and subnet masks are correct.

D.

Verify the virtual NIC in the Foundation VM is bound to the correct wireless network adapter.

Buy Now
Question # 93

A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices. The customer has requested that the Nutanix cluster only have a single datastore.

Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.

What should the consultant do to resolve this issue?

Options:

A.

Turn off and then turn back on HA.

B.

Make sure the DRS setting is turned on.

C.

Create a second container.

D.

Whitelist the vCenter IP address within Prism.

Buy Now
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)
Last Update: Feb 23, 2025
Questions: 309
NCS-Core pdf

NCS-Core PDF

$25.5  $84.99
NCS-Core Engine

NCS-Core Testing Engine

$28.5  $94.99
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$40.5  $134.99