Short-term bicycle storage in Location and Transportation Credit, Bicycle Facilities must be within 100 ft. (30 m) walking distance of any:
A building owner installs a building automation system (BAS) to allow programmable load control. Which of the
following credits can be pursued because of the installation?
At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's
Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?
What document allows a LEED AP to register a project and sign the Certification Agreement?
A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?
What is the system boundary that a building life cycle analysis must be defined to account for?