What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?
Which of the following variables must be included in the calculations for Indoor Environmental Quality Credit, Quality Views?
Which rating system is being used if all of the credits below have been submitted towards certification?
- Location and Transportation Credit, Reduced Parking Footprint
- Energy and Atmosphere Credit, Fundamental Refrigerant Management
- Indoor Environmental Quality Credit, Acoustic Performance
- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?
Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?
For a whole building energy simulation approach, what should be identical for the base building and the proposed building?
The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site: