A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first
affected by this change?
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?
A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?
What is the reference standard that defines the requirements for LEED energy modeling?
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?
Which of the following documents detail the ideas, concepts, and criteria determined to be important to the success of a building?
A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a
Which strategy can maximize the efficiency of water use in an irrigation system?
A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?