Question # 64

A LEED Building Design and Construction: New Construction office building ' s HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

Options:

A.

natural gas

B.

hot water at the main service point

C.

nothing, because the flat fee is included as part of the lease

D.

nothing, because the energy source is outside of the project ' s scope

Buy Now
Question # 65

Which of the following documents detail the ideas, concepts, and criteria determined to be important to the success of a building?

Options:

A.

Design review log

B.

Basis of design

C.

Integrated project delivery

D.

Owner ' s project requirements

Buy Now
Question # 66

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

Options:

A.

LTc3: Compact and Connected Development

B.

EAc1: Electrification

C.

WEc2: Enhanced Water Efficiency

Buy Now
Question # 67

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Buy Now
Question # 68

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

Options:

A.

all luminaires have full cutoff fixtures

B.

all luminaires have a minimum color temperature of 3500 K

C.

all luminaires meet acceptable fixture ratings for the project ' s Model Lighting Ordnance (MLO) lighting zone

D.

all luminaires are mounted at least three mounting heights from the lighting boundary

Buy Now
Question # 69

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices

Buy Now
Question # 70

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

Options:

A.

All luminaires have full cutoff fixtures

B.

All luminaires are mounted at least three mounting heights from the lighting boundary

C.

All luminaires have a minimum color temperature of 3500 K

D.

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Buy Now
Question # 71

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

Options:

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Buy Now
Question # 72

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.

Verify installation and performance of the commissioned systems

B.

Review the building10 months after substantial completion

C.

Verify that training requirements are completed

D.

Develop a systems manual for the commissioned systems

Buy Now
Question # 73

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a¼ mile (0.40 km) radiusof the project boundary

B.

Measure densities within a¾ mile (1.20 km) radiusof the project boundary

C.

Measure densities within a⅓ mile (0.53 km) radiusof the project boundary

D.

Measure densities within a½ mile (0.80 km) radiusof the project boundary

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Oct 4, 2026
Questions: 442
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$21.25  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$23.75  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$33.75  $134.99