Question # 54

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Buy Now
Question # 55

What is the sequence of the process for LEED certification?

Options:

A.

Submit documentation through LEED Online, Choose Rating System, Review, Register, Certify

B.

Submit documentation through LEED Online, Choose Rating System, Register, Review, Certify

C.

Choose Rating System, Register, Submit documentation through LEED Online, Review, Certify

D.

Choose Rating System, Register, Submit documentation through LEED Online, Certify, Review

Buy Now
Question # 56

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Buy Now
Question # 57

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Buy Now
Question # 58

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

Buy Now
Question # 59

Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

Options:

A.

Providing an educational program on the environmental and human health benefits of green building practices

B.

Including locked, indoor bicycle storage for 100% of project occupants

C.

Being located next to a 20 mi. (32 km) award-winning bicycle trail

D.

Distributing leaflets to project occupants about available public transit services nearby

Buy Now
Question # 60

What is the definition of the evapotranspiration rate?

Options:

A.

Evaporation of onsite reuse water

B.

Percentage of potable water usage for irrigation

C.

Water loss from evaporation in micro irrigation systems

D.

Amount of water loss in a vegetated surface in units of water depth

Buy Now
Question # 61

When should a preliminary water budget analysis be conducted?

Options:

A.

At the time the plumbing contractor is selected

B.

Before completion of schematic design

C.

At the time the design development is completed

D.

After completion of schematic design

Buy Now
Question # 62

Building Product Disclosure and Optimization is based on market

Options:

A.

reliability

B.

durability

C.

transparency

D.

consumption

Buy Now
Question # 63

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

Options:

A.

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.

Unfurnished, teacher speaking, HVAC operating at typical level

C.

Furnished, no occupants, HVAC operating at typical level

D.

Unfurnished, no occupants, HVAC operating at maximum flow rates

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Feb 23, 2025
Questions: 304
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99