Question # 54

What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Average number of occupants standing or seated

D.

Typical duration of occupancy in each space per day

Buy Now
Question # 55

Which of the following strategies will aid in reducing indoor water use?

Options:

A.

Design drip irrigation for landscape

B.

Use high-efficiency HVAC systems

C.

Exclude janitor closets in the building

D.

Optimize consumption of showerheads

Buy Now
Question # 56

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

Options:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Buy Now
Question # 57

The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by

Options:

A.

utilizing a once-through system without recirculation

B.

limiting cooling tower make-up to 50% of a potable source

C.

conducting a one-time potable water analysis to determine acceptable non-potable sources

D.

achieving a minimum of 10 cooling tower cycles by increasing the level of make-up water treatment

Buy Now
Question # 58

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Buy Now
Question # 59

Which of the following is an example of a nonroof measure for Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

A playground with artificial turf

B.

A vegetated shading structure

C.

A shade structure with a three-year aged Solar Reflectance Index (SRI) value of 0.2

D.

A paving material with a three-year aged SRI value of 0.2

Buy Now
Question # 60

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building's mechanical engineer should commission his own installations and share the results with the project owner

Buy Now
Question # 61

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Options:

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Buy Now
Question # 62

Building Product Disclosure and Optimization is based on market

Options:

A.

reliability

B.

durability

C.

transparency

D.

consumption

Buy Now
Question # 63

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

Options:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Apr 3, 2025
Questions: 337
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99