Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?
A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?
A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum
Energy Performance, what option is used?
A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings
on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of
the following would be the best design approach?
The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve
What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,
manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The
intent of this bonus is