Question 64

An engineer must configure device aliases for a Cisco MDS 9000 Series Switches-based SAN fabric. The configuration must meet these requirements:

• The engineer must be prompted before the changes are committed to the database.

• Pending changes must be explicitly displayed on the console.

Which command accomplishes this task?

Options:

A.

device-alias enhanced

B.

device-alias commit

C.

device-alias confirm-commit

D.

device-alias distribute diffs-only

Question 65

What are two types of FC/FCoE oversubscription ratios? (Choose two.)

Options:

A.

server storage to end-node count

B.

port bandwidth to uplink bandwidth

C.

edge ISL bandwidth to core ISL bandwidth

D.

host bandwidth to storage bandwidth

E.

switch processing power to end-node processing power

Question 66

An engineer must perform an initial configuration of VXLAN Tunnel End-Point functionality on the Cisco Nexus 9000 Series platform All the necessary features are already enabled on the switch Which configuration set must be used to accomplish this goal?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 67

An engineer is using REST API calls to configure the cisco APIC. Which data structure must be used within a post message to receive a login token?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Page: 16 / 36
Exam Code: 350-601
Exam Name: Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Last Update: Dec 23, 2024
Questions: 489
350-601 pdf

350-601 PDF

$28.5  $94.99
350-601 Engine

350-601 Testing Engine

$33  $109.99
350-601 PDF + Engine

350-601 PDF + Testing Engine

$43.5  $144.99