Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

CCNP Data Center 350-601 Exam Dumps

Page: 22 / 36
Question 88

An engineer must configure a Nexus 7000 series switch for HSRP on VLAN 100. When fully functional, the router must be the active master. Which set of commands must be used to implement the scenario?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 89

Which two statements about the process of upgrading an EPLD on a Cisco MDS 9000 series Switch are correct? (Choose two.)

Options:

A.

The EPLDs for all the modules on a switch must be upgraded at the same time.

B.

EPLD upgrades can be completed without powering down the module during the upgrade.

C.

EPLDs can be upgraded only to the latest EPLD image.

D.

EPLDs can be upgraded without replacing the hardware.

E.

An upgrade verification identifies the impact of each EPLD upgrade.

Question 90

What is a characteristic of EPLD updates on Cisco MDS 9000 Series Switches?

Options:

A.

EPLD updates are installed only via the Cisco DCNM GUI

B.

EPLD packages update hardware functionality on a device

C.

EPLD bundles are released separately from a Cisco MDS NX-OS release

D.

EPLD updates are nondisruptive to traffic flow

Question 91

Which storage protocol reduces file locks by using leasing?

Options:

A.

CIFS

B.

NFS 4

C.

NFS 3

D.

SMB

Page: 22 / 36
Exam Code: 350-601
Exam Name: Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Last Update: Nov 23, 2024
Questions: 489
350-601 pdf

350-601 PDF

$28.5  $94.99
350-601 Engine

350-601 Testing Engine

$33  $109.99
350-601 PDF + Engine

350-601 PDF + Testing Engine

$43.5  $144.99