Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]
a. Regression tests run and passed in systems testing
b. Incidents closed in systems testing
c. Planned tests run and passed in system testing
d. Planned tests run and passed at all levels of testing
e. Incidents raised and closed at all levels of testing
Which of the following are valid test objectives?
(i)Finding defects.
(ii)Gaining confidence about the level of quality and providing information.
(iii)Preventing defects.
(iv)Debugging the code.
What other details should be included in the following incident report when it is first submitted?
Date of Issue: 23/11/05
Severity: P1
Build: Version15.6
Details: Expected field to be limited to 15 chars, able to enter 27