Question # 74

In which of the following test documents would you expect to find test exit criteria described?

Options:

A.

Test plan

B.

Project plan

C.

Test design specification

D.

Requirements specification

Buy Now
Question # 75

Which of the following test types is a part of the V-Model?

Options:

A.

Black-box testing

B.

White-box testing

C.

Experience-based testing

D.

Component testing

Buy Now
Question # 76

Which of the following sentences is correct?

Options:

A.

Functional and Structural tests can be performed at all test levels

B.

Functional tests can be performed at Unit and Integration test levels, while Structural tests can be performed at System test level

C.

Functional and Structural test levels can be performed for all test types

D.

Functional tests can be performed at Integration and System test levels, while Structural tests can be performed at Unit test level

Buy Now
Question # 77

At what stage of the Fundamental Test Process do testers write the steps of the test procedures?

Options:

A.

Test implementation and execution

B.

Evaluating exit criteria and reporting

C.

Test closure activities

D.

Test planning and control

Buy Now
Question # 78

Which of the following is a direct benefit of maintaining traceability between the test basis and test work products'?

Options:

A.

The ability to give meaningful names to documents

B.

The ability to analyse the impact of changes

C.

The ability to identify the author of each document

D.

The ability to determine the best test design approach

Buy Now
Question # 79

In which development life cycle model is regression testing an increasingly important activity as the project progresses?

Options:

A.

V-model.

B.

Waterfall.

C.

Scrum.

D.

Progressive.

Buy Now
Question # 80

A live defect has been found where a code component fails to release memory after it has finished using it.

Which of the following tools would have been the MOST effective at detecting this defect prior to live implementation?

Options:

A.

Dynamic analysis tool

B.

Monitoring tool

C.

Configuration management tool

D.

Coverage measurement tool

Buy Now
Question # 81

Which test level is concerned with testing the smallest bodies of software?

Options:

A.

Component test

B.

Feature test

C.

Functional test

D.

Subsystem test

Buy Now
Question # 82

Which of the following statements is true?

Options:

A.

Regression testing is a technique for system testing and acceptance testing only.

B.

Regression testing can be used in any level of testing, but must be done after white-box testing has been finished.

C.

Regression testing is an alternative term for re-testing

D.

Regression testing is intended to find side-effects after changes have been applied to the system under test.

Buy Now
Question # 83

Which of the following statements regarding incidents is NOT true?

Options:

A.

Incidents should be tracked from discovery and classification to correction and confirmation of the solution.

B.

The discrepancies between actual and expected outcomes need to be logged as incidents

C.

Since incidents are the discrepancies between actual and expected outcomes they cannot be raised during development

D.

Incidents may be raised during development, review, testing or use of a software product

Buy Now
Exam Code: CTFL_Syll2018
Exam Name: ISTQB Certified Tester Foundation Level (Syllabus 2018)
Last Update: Feb 22, 2025
Questions: 365
CTFL_Syll2018 pdf

CTFL_Syll2018 PDF

$25.5  $84.99
CTFL_Syll2018 Engine

CTFL_Syll2018 Testing Engine

$28.5  $94.99
CTFL_Syll2018 PDF + Engine

CTFL_Syll2018 PDF + Testing Engine

$40.5  $134.99