Question # 24

What can testing demonstrate?

Options:

A.

Testing can demonstrate that there are no defects

B.

Testing can demonstrate that there are defects

C.

Testing can demonstrate that the software is correct

D.

Testing can demonstrate that there are no hidden defects in the software

Buy Now
Question # 25

Which of the main activities of the fundamental test process does the task ‘verify the test environment set up is correct’ relate to? [K1]

Options:

A.

Planning and control

B.

Analysis and design

C.

Implementation and execution

D.

Evaluating exit criteria and reporting

Buy Now
Question # 26

A test case starts at S1 and triggers 4 events in sequence: E1, E4, E5, E7. What will be the finishing state and the output(s) from the test case? [K3]

Refer to the exhibit

Options:

A.

S2 and O4

B.

S4 and O2

C.

S4 and O4

D.

S2 and O2

Buy Now
Question # 27

What is decision table testing?

Options:

A.

It’s a testing design technique based in the internal software structure.

B.

It’s a static test design technique.

C.

It’s a testing design technique to verify decisions.

D.

It’s a testing design technique based in the system requirements.

Buy Now
Question # 28

A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.

Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?

Options:

A.

Performance, Usability, Regression.

B.

System, Load, Fail-over.

C.

Performance, Load, Stress.

D.

Load, Volume and Component.

Buy Now
Question # 29

Which of the following is a valid objective of testing? [K1]

Options:

A.

Correcting defects

B.

Locating defects in the code

C.

Preventing defects

D.

Ensuring no defects are present

Buy Now
Question # 30

Which of the following metrics could be used to monitor progress along with test preparation and execution? [K1]

Options:

A.

The total number of tests planned

B.

The total number of requirements to be tested

C.

The failure rate in testing already completed

D.

The number of testers used for test execution so far

Buy Now
Question # 31

What is the main reason for using a pilot project to introduce a testing tool into an organization? [K1]

Options:

A.

To identify the requirements for using a tool

B.

To make a selection between alternative tools

C.

To assess whether the tool will be cost- effective

D.

To ensure the tools fits existing processes without change

Buy Now
Question # 32

Which of the following is a consideration when deploying test execution tools? [K1]

Options:

A.

Data-driven testing cannot be used with test execution tools

B.

Recorded manual tests may become unstable in use

C.

Keyword-driven testing cannot be used with test execution tools

D.

Expected results for tests are not required because the tool generates expected results

Buy Now
Question # 33

What factors should be considered to determine whether enough testing has been performed?

(i)The exit criteria.

(ii)The budget.

(iii)How big the test team is.

(iv)The product's risk profile.

(v)How good the testing tools are.

(vi)Sufficient details of the system status to allow decisions

Options:

A.

i and ii and iv and vi

B.

i and ii and iii and vi

C.

ii and iii and iv and v

D.

i and ii and v and vi

Buy Now
Exam Code: CTFL_Syll2018
Exam Name: ISTQB Certified Tester Foundation Level (Syllabus 2018)
Last Update: Feb 22, 2025
Questions: 365
CTFL_Syll2018 pdf

CTFL_Syll2018 PDF

$25.5  $84.99
CTFL_Syll2018 Engine

CTFL_Syll2018 Testing Engine

$28.5  $94.99
CTFL_Syll2018 PDF + Engine

CTFL_Syll2018 PDF + Testing Engine

$40.5  $134.99