Question # 24

Which of the following statements is TRUE with respect to TMMi Levels 4 and 5 in an Agile context?

Options:

A.

Because Agile projects tend to focus on defect detection rather than defect prevention, Process area 5.1 Defect Prevention is less relevant when assessing an Agile organisation for TMMi level 5.

B.

Process area 4.3 Advanced Reviews is less relevant in an Agile context because quality tends to be a team effort and verification and validation tend to be discussed at team meetings, not in formal reviews.

C.

When considering the achievement of specific goals in process area 5.3 Test Process Optimization in an Agile context, the deployment of new testing technologies and test improvements do not have to be made across the whole organization, since Agile teams are autonomous and can decide which improvements suit their way of working best.

D.

Agile projects normally do not use operational profiles or usage models of a product on which to base statistically valid inferences to help create a representative sample of tests, thus the TMMi level 5 specific goal “Testing is performed using Statistical Methods” is considered not relevant in an Agile context.

Buy Now
Question # 25

Which of the following statements is TRUE?

Options:

A.

The maturity levels of TMMi describe detailed sub-practices for each specific goal.

B.

Each process area has exactly the same set of generic practices for generic goal 2.

C.

Specific goals can have different specific practices at different maturity levels.

D.

Sub-practices must be implemented together with the typical work products that are described for them in the TMMi model.

Buy Now
Question # 26

A test process assessment has been performed at an embedded software organization. All process areas at TMMi Levels 2 and 3 were in scope of the assessment. Many practices required by the TMMi model are already in place, but the organization is missing a master test plan spanning multiple test levels.

Which of the following process areas would most likely need specific attention to address the above-mentioned shortcoming?

Options:

A.

Test Policy and Strategy

B.

Test Planning

C.

Test Organization

D.

Test Life Cycle and Integration

Buy Now
Question # 27

Which of the following process areas is a TMMi level 3 process area?

Options:

A.

Test Design and Execution

B.

Quality Control

C.

Non-Functional Testing

D.

Advanced Reviews

Buy Now
Question # 28

Which type of TMMi model component is described hereafter?

“The components guide those who implement improvements or perform assessments. Either the practices as described or acceptable alternatives to the practices must be present in the processes of the organization

before goals can be considered satisfied.”

Options:

A.

Required component

B.

Expected components

C.

Informative components

D.

Alternative component

Buy Now
Question # 29

Which of the following specific goals would you be targeting during the implementation of the Test Planning process area?

Options:

A.

Perform a Product Risk Assessment

B.

Establish a Test Organization

C.

Establish a Master Test Plan

D.

Determine, Plan and implement Test Process Improvements

Buy Now
Question # 30

Which of the following statements is a correct description of the scope of the TMMi model?

Options:

A.

The TMMi model is specifically targeted towards higher test levels (e.g., system test and acceptance test).

B.

The TMMi model is specifically targeted at dynamic testing and does NOT address static testing.

C.

The TMMi model is intended to support testing activities and test process improvement in both the systems engineering and software engineering discipline.

D.

The TMMi model includes requirements for both formal and informal TMMi assessments.

Buy Now
Question # 31

A test process assessment against TMMi levels 2 and 3 has been performed on an international outsourcing software organization. Although many practices, as required by the TMMi model, are already in place, projects suffer from poor test estimations.

Which of the following process areas would need specific attention to address the above mentioned shortcoming?

Options:

A.

Test Techniques

B.

Test Planning

C.

Test Design and Execution

D.

Test Training Program

Buy Now
Question # 32

TMMi has various types of components. Match the component types with the appropriate description.

Component types:

Options:

A.

Required component

B.

Expected component

C.

Informative component

Descriptions:

I)Supports the understanding

II)Must be achieved

III)Will typically be implemented

D.

A-l, B — II, C — III

E.

A— Ml B — II. C-l

F.

A—II. B — III, C-l

G.

A-ll B — I, C — III

Buy Now
Question # 33

Which of the following statements are TRUE?

Options:

A.

The TMMi process area Test Planning is supported by the CMMI process areas Project Planning, Requirements Management and Risk Management.

B.

Practices within Specific Goal 2 (Perform Peer Reviews) of the CMMI process area Validation provide support for implementation of the TMMi process area Peer Reviews.

C.

The CMMI process area Causal Analysis and Resolution Process Area provides support for implementation of TMMi process area Quality Control.

D.

Implementation of Non-Functional Testing process area of TMMi is supported by the CMMI process area Performance Management.

Buy Now
Exam Code: TMMi-P_Syll2020
Exam Name: TMMi - Test Maturity Model Integration Professional
Last Update: Feb 22, 2025
Questions: 111
TMMi-P_Syll2020 pdf

TMMi-P_Syll2020 PDF

$25.5  $84.99
TMMi-P_Syll2020 Engine

TMMi-P_Syll2020 Testing Engine

$28.5  $94.99
TMMi-P_Syll2020 PDF + Engine

TMMi-P_Syll2020 PDF + Testing Engine

$40.5  $134.99