Question # 64

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.

The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its trading partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.

TOGAF 9 has been selected for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

In the Preliminary Phase you need to define suitable policies and ensure that the company has the appropriate capability to address the concerns of the Corporate Board.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You start by clarifying the intent that the Board has for raising these concerns. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objectives. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture and that this be considered an additional domain architecture.

B.

You evaluate the implications of the Board's concerns by examining the security and regulatory impacts on business goals, business drivers and objectives. Based on your understanding, you then update the current security policy to include an emphasis on the concerns. You define architecture principles to form constraints on the architecture work to be undertaken in the project. You then allocate a security architect to ensure that security

C.

You identify and document the security and regulatory requirements for the application and the data being collected. You ensure that written policies are put in place to address the requirements, and that they are communicated across the organization, together with appropriate training for key employees. You identify constraints on the architecture and communicate those to the architecture team. You establish an agreement with the security

D.

You evaluate the implications of the concerns raised by the Corporate Board in terms of regulatory requirements and their impact on business goals and objectives. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the concerns. You allocate a security architect to oversee the implementation of the new application that is being de

Buy Now
Question # 65

Scenario:

Please read this scenario prior to answering the Question

You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.

The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.

"Just In Time" manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.

As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity. The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.

The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.

Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.

Refer to the Scenario

You have been asked to recommend a response to the Chief Architect's request to tailor the TOGAF Content Metamodel.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamodel. As the environment is process-centric this will enable them to model the manufacturing processes and store information to support regulatory compliance. It also includes views useful for managing the consolidation of applications into a single data center.

B.

You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamodel. This is suitable as this is a significant IT change that will impact its operational models. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.

C.

You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamodel. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data center. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.

D.

You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamodel. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing process. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Buy Now
Question # 66

Scenario:

Please read this scenario prior to answering the question

The ABC company is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The company Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

You are serving as the Lead Enterprise Architect of the newly-formed Common ERP Deployment architecture project team.

As the Common ERP Deployment architecture project team assembles for its initial meeting, many of the participants have voiced concerns about the sweeping scope of the initiative. Others are confident that they know a solution that will work. During the meeting, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the characteristics of the architecture from the business requirements.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary target Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should create Baseline and Target Architectures for each of the manufacturing plants. A gap analysis between the architectures will then validate the approach, and determine the Transition Architecture needed to achieve the target state.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of requirements can be developed that will drive the evolution of the architecture.

Buy Now
Question # 67

During a TOGAF ADM cycle, an architecture is denoted as Version 10. What does this indicate?

Options:

A.

A draft, detailed architecture

B.

A formally reviewed, detailed architecture

C.

A formally reviewed, preliminary architecture

D.

A preliminary outline architecture

E.

A high-level outline architecture

Buy Now
Question # 68

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect in a multinational automotive and clean

energy company. The company designs and manufactures electric vehicles, battery

storage, and solar panels. The company has multiple manufacturing facilities, in North

America, Europe, and in Asia. Most of the facilities are wholly owned by the company,

but two in Asia are jointly owned with local partners.

The company has a mature Enterprise Architecture practice that is supported by a

cross-functional Architecture Board. The TOGAF standard is used for developing the

automated manufacturing process and systems used to design, manufacture and test

the new design. The Chief Information Officer and the Chief Operating Officer co-

sponsor the Enterprise Architecture program.

A challenge that the company is facing is to scale up the number of vehicles coming

off the production lines to meet customer demand. At the moment there are supply

chain shortages for key custom-designed electronic components used in the vehicles.

In response to this, the research arm of the company has pioneered the development

of a revised design using common off-the-shelf components that will allow for a

significant increase in overall vehicle production. This new design is ready to go into

production.

As part of putting the new design into production, adjustments to the automated

assembly processes need to be made. A pilot architecture project at a single location

has defined an updated approach for controlling the automated systems used to

perform final assembly and quality assurance. The Chief Engineer, sponsor of the

activity, and the Architecture Board have approved the plan for immediate

implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement

and deploy the new automated system controller for each location. The Chief

Engineer has expressed concern that a uniform process be employed at each location

to ensure consistency and quality.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief

Engineer's concern.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would use the Architecture Contracts to manage the architecture

governance processes for the project across the locations. You would ensure

that the quality of each completed vehicle at each location is assessed, and

any local change requirements identified, if necessary. You recommend that if

a deviation from the contract is detected, the Architecture Board should modify

the Architecture Contract to allow

B.

You would review the Architecture Contract for each location, ensuring that it

addresses the project objectives, effectiveness metrics, acceptance criteria,

and risk management. Where applicable, you ensure that the contract is legally

enforceable. You would schedule compliance reviews at key points in the

assembly and quality assurance process to ensure that the work is proceeding

in accordance with the Archit

C.

You would create an Architecture Contract to manage and govern the

implementation and migration process at each location. For wholly owned

facilities, you issue a memorandum of understanding between the Architecture

Board and the implementation organization. For facilities jointly owned by local

partners, you would ensure that the contract is legally enforceable. You would

then ensure that the Architecture Boar

D.

You would create an Architecture Contract to govern the update to the

automated system controller at each location. For facilities managed by

partners, you ensure that it is a fully enforceable legal contract, and you would

schedule additional compliance reviews at key points in the assembly and

quality assurance process. These additional reviews would be for an initial

period until no deviations from the contr

Buy Now
Question # 69

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.

Refer to the Scenario

As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities.

You need to specify the best approach for this work.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You gather information from credible industry sources in the commodities business. Based on that, you assess current trends and apply that to defining a set of principles that embody best practices. You select architecture principles that do not conflict with each other and that should be stable. You ensure that all the principles are realistic and avoid including principles that are obvious.

B.

You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you define a set of principles and review with the CIO. When developing the principles, you ensure that they actively promote the alignment of IT with the business strategies and initiatives of the company. You then seek the endorsement of the CIO and senior management.

C.

You define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charter. You publish the principles on the corporate intranet to ensure widespread acceptance and compliance. You then schedule regular periodic Compliance Assessments with individual business units to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in the principle

D.

You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you work with the Architecture Board to define the principles. When developing the principles, you ensure that they actively promote the alignment of IT with the corporate business strategies. You then hold a series of review meetings with all the relevant stakeholders, including senior management, ensu

Buy Now
Question # 70

Scenario

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Chief Enterprise Architect of a multinational corporation. The corporation has over 100,000 employees and is organized into 10 divisions with operation in over 60 countries and products sold in over 125 countries. It has major research sites at 8 locations worldwide.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of its products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a trial for a new product.

The Enterprise Architecture group within the company has been engaged in an architecture development system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.

The Enterprise Architecture group is a mature organization. They use the TOGAF ADM with extensions required to support the manufacturing practices and laboratory practices of their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security, regulatory and privacy issues that are relevant.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the Enterprise Architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.

Refer to the Scenario

You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture (s)

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap, you would classify whether the solution is either a new development, purchased solution, or based on an existing product. You would group the similar solutions together to define the work packages. You would then regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the s

B.

You would determine the set of Solution Building Blocks required by identifying which need to be developed and which need to be procured. You would eliminate any duplicate building blocks, and then group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. You would then rank the work packages in terms of cost, and select the most cost-effective options for inclusion in a series of Transition Arch

C.

You would document the factors impacting the implementation and Migration Plan and group the gaps identified in the domain architecture gap analysis results. For each gap, you would identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. You would group similar solutions together to form work packages, and identify dependencies between the work packages and identify dependencies

D.

You would group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool you would then regroup the work packages to account for dependencies. You would sequence the work packages to account for dependencies. You would sequence the work packages into the Capability Increments needed to achieve the Target Architecture. You would schedule the roll

Buy Now
Question # 71

Which of the following best describes the Reference Library within the Architecture Repository?

Options:

A.

Guidelines and templates used to create new architectures

B.

Processes to support governance of the Architecture Repository

C.

A description of the organization specific architecture framework and method

D.

Specifications to which architectures must conform

E.

A record of the governance activity across the enterprise

Buy Now
Question # 72

Which of the following types of architecture defines technology standards for building blocks and reflects general computing requirements?

Options:

A.

Industry Architecture

B.

Transition Architecture

C.

Foundation Architecture

D.

Organization-Specific Architecture

E.

Common Systems Architecture

Buy Now
Question # 73

Scenario:

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

B.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.

C.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

D.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.

Buy Now
Exam Code: OG0-093
Exam Name: TOGAF 9.2 Combined Part 1 and Part 2
Last Update: Feb 22, 2025
Questions: 420
OG0-093 pdf

OG0-093 PDF

$25.5  $84.99
OG0-093 Engine

OG0-093 Testing Engine

$28.5  $94.99
OG0-093 PDF + Engine

OG0-093 PDF + Testing Engine

$40.5  $134.99