Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-O+M Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 44

Which of the following statements must be true in order to achieve the Water Metering Credit?

Options:

A.

All meters must be recorded weekly and shared with USGBC over a five-year period beginning on the date the project accepts LEED certification

B.

All meters must be recorded biweekly and shared with USGBC over a three-year period begin-ning on the date the project accepts LEED certification

C.

All meters must be recorded biweekly and shared with USGBC over a five-year period begin-ning on the registration date of the LEED project

D.

All meters must be recorded weekly and shared with USGBC over a three-year period begin-ning on January 1st of the year in which the project accepts LEED certification

Buy Now
Question # 45

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

Options:

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Buy Now
Question # 46

In order to determine the transportation patterns of occupants of a typical office building, a survey requesting data from what period of time should be administered to meet the requirements of the Location and Transportation Credit, Alternative Transportation?

Options:

A.

Three days

B.

Five days

C.

10 days

D.

14 days

Buy Now
Question # 47

To fulfill the Indoor Environmental Quality Prerequisite, Green Cleaning Policy, cleaning chemicals must be handled in a manner that

Options:

A.

meets ASHRAE standards

B.

reduces transportation expenses

C.

is in accordance with ASTM-779-03

D.

limits opportunities for accidental spills and leaks

Buy Now
Question # 48

Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?

Options:

A.

Meet at least 10% of total energy with on-site renewable energy

B.

Reduce outdoor water use by 60%

C.

Document an alternative transport

D.

Obtain a response rate for the occupant comfort survey of 100%

Buy Now
Question # 49

What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

Cost of compliant furniture

B.

Weight of compliant furniture

C.

Cost of both compliant and non-compliant furniture

D.

Weight of compliant and non-compliant furniture

Buy Now
Question # 50

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Options:

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Buy Now
Question # 51

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Options:

A.

Implement an alternative transportation program and conduct a transportation survey

B.

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.

Implement an alternative transportation program and estimate the alternative transportation rate

Buy Now
Question # 52

Which system can significantly reduce or completely eliminate the amount of potable water used for irrigation?

Options:

A.

Drip irrigation system

B.

Irrigation metering system

C.

Moisture sensor system

D.

Rainwater collection system

Buy Now
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Jan 31, 2025
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99