Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-O+M Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 24

A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?

Options:

A.

550 lumens

B.

650 lumens

C.

1,500 lumens

D.

2,500 lumens

Buy Now
Question # 25

One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must

Options:

A.

estimate the purchases of the other tenants and assume they are compliant in the Materials and Resources credit calculations

B.

estimate the purchases of the other tenants and assume they are noncompliant in the Materials and Resources credit calculations

C.

estimate the purchases of the other tenants and apply the compliance rate from LEED applicant in the Materials and Resources credit calculations

D.

exclude the purchases of the other tenants from the Materials and Resources credit calculations

Buy Now
Question # 26

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Buy Now
Question # 27

A management method that could be included in a project's site management policy is the use of

Options:

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Buy Now
Question # 28

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement

Plan?

Options:

A.

Soils

B.

Hydrology

C.

Vegetation

D.

Maintenance equipment

Buy Now
Question # 29

The compliant value of green cleaning products and materials is calculated using what factor?

Options:

A.

Cost

B.

Weight

C.

Volume

D.

Recycled content

Buy Now
Question # 30

At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Air speed and humidity

B.

Humidity and air temperature

C.

Air speed and air temperature

D.

Radiant temperature and air speed

Buy Now
Question # 31

A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance: Existing Buildings.

What program requirements apply?

Options:

A.

The project is already certified and it is not eligible

B.

The building is immediately eligible because of the previous certification

C.

The project needs to be occupied for one year prior to pursuing this certification

D.

The project needs to be occupied for two years prior to pursuing this certification

Buy Now
Question # 32

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

Options:

A.

Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction

B.

Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction

C.

The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction

D.

The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction

Buy Now
Question # 33

What is the percentage range of total municipal waste that commercial and institutional buildings typically account

for?

Options:

A.

25% to 35%

B.

35% to 45%

C.

45% to 55%

D.

55% to 65%

Buy Now
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Jan 31, 2025
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99