A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
A community seeking LEED tor Neighborhood Development Certificationisplanning to design and constructa permanent gardenand provide related facilities for local residents to cultivate food production. The community Is in an area of 10 acres (4.05 hectares) and contains 120 dwelling units. According to the requirements of'local food production.* what is the minimum area of the community garden?
A)
B)
C)
D)
What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?