Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-ND Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 4

A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?

Options:

A.

Green Infrastructure and Buildings. Optimize Building Energy Performance

B.

Green Infrastructure and Buildings. Outdoor Water Use Reduction

C.

Green Infrastructure and Buildings Heal Island Reduction

D.

Green Infrastructure and Buildings. Renewable Energy Production

Buy Now
Question # 5

For Neighborhood Patternand Design Tree-Lined and Shaded Streetscapes Credit- Option 2 Shaded Sidewalks.what size ofnewly planted trees can be considered in calculating the percentage or shaded sidewalks?

Options:

A.

Crown diameter at time of purchase

B.

Crown diameter at time of planting

C.

Crown din motor five years after planling

D.

Crown diameter 10 years after planting

Buy Now
Question # 6

A LEEDV for Neighborhood Development registeredproject is planning on using airconditioning condensate tor flushing toilets in all new buildings. WhatLEED Prerequisite or creditwill this design help achieve?

Options:

A.

GIB Credit Rainwater Management

B.

Credit Outdoor Water Use Reduction

C.

GIB Credit Wastewater Management

D.

GIB Credit indoor Water Use Reduction

Buy Now
Question # 7

Which of the following strategies is a best practice for reducing a project's development footprint?

Options:

A.

increase the amount of impervious area on-site

B.

Provide parking under or within a building structure

C.

Increase the number of cul-de-sacs throughout the site

D.

Implement a construction erosion and sedimentation control plan

Buy Now
Question # 8

A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

Options:

A.

One

B.

Two

C.

Three

D.

Five

Buy Now
Question # 9

Which of the following will be achieved If the project site is an infill site?

Options:

A.

Floodplain Avoidance

B.

Steep Stope Protection

C.

Mixed-Se Neighborhoods

D.

Agricultural Land Conservation

Buy Now
Question # 10

A community seeking LEED tor Neighborhood Development Certificationisplanning to design and constructa permanent gardenand provide related facilities for local residents to cultivate food production. The community Is in an area of 10 acres (4.05 hectares) and contains 120 dwelling units. According to the requirements of'local food production.* what is the minimum area of the community garden?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Question # 11

What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?

Options:

A.

Density of the project

B.

intersections per square mile

C.

City land development codes

D.

Covenants, conditions, and restrictions

Buy Now
Question # 12

An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?

Options:

A.

increasing stormwater flow rates off a site

B.

Providing a long term strategy for flood control

C.

Preventing air pollution with dust and particulate matter

D.

Reducing greenhouse gas emissions associated with the project

Buy Now
Question # 13

A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?

Options:

A.

Provide points of connectivity of 140 street intersections per square mile

B.

Provide a park and ride parking, lot within 150 ft. (46 m) ofthe transit shelter

C.

Display transit schedules and route information at each publictransit stop

D.

Transit agency confirmation that additional weather protected transit shelters will be provided within five years of protect completion.

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Jan 31, 2025
Questions: 100
LEED-AP-ND pdf

LEED-AP-ND PDF

$25.5  $84.99
LEED-AP-ND Engine

LEED-AP-ND Testing Engine

$28.5  $94.99
LEED-AP-ND PDF + Engine

LEED-AP-ND PDF + Testing Engine

$40.5  $134.99