Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-ND Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 24

Which of the following can be included within the boundary of a project site on an urban waterfront?

Options:

A.

Dock to be constructed by the developer

B.

House boats in place prior to the issuance of certificate of occupancy

C.

Marina pier in place prior to the date of property acquisition

D.

Jetty with funding for construction prior to the date of certification

Buy Now
Question # 25

Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?

Options:

A.

edema index

B.

Light emitting diodes

C.

Backlight-uplight-glare

D.

illuminating Engineering Society. Stage A Evaluation

Buy Now
Question # 26

A project team is planning to achieve the maximum points in the Regional Priority category. The LEED AP should

Options:

A.

use any credit that seems appropriate tor the location of the project.

B.

refer to USGBCs website to determine which credits are eligible as the Regional Priority credits for the project's location.

C.

review similar protects to see which Regional Priority credits were achieved.

D.

choose the appropriate Regional Priority credits based on personal experience

Buy Now
Question # 27

A mixed-use development includes a 150.00011'' (13.935 m2) office building. Which energy analysis option can be considered under Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance for this building?

Options:

A.

Performance rating method of ENERGY STAR

B.

Performance rating method ANSI/ASHRAE/ESNA Standard 90.1-2010

C.

Prescriptive measures in the Advanced Buildings® Core Performance™® Guide

D.

Prescriptive measures of the ASHRAE Advanced Energy Design Guide for Small to Medium Office Buildings

Buy Now
Question # 28

Which strategies meet the requirements tor Neighborhood Pattern and Design Credit. Transportation Demand Management?

Options:

A.

Obtain a variance to allow a 25% reduction from local regulatory minimum parking requirements

B.

Sell or rent associated parking spaces separately from 50% ofdwelling units and/or nonresidential square

C.

Subsidize yearly transportation passes by at least 50% for 100% of the occupants ofthe project for a minimum ofthree years

D.

Ensure that 50% of the residential units and non-residential building enhances ore within a t/4mi(0.4km) walking distance of a shared vehicle

Buy Now
Question # 29

What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?

Options:

A.

Rainwater reuse rate

B.

Cost of installing wastewater system

C.

Average amount of annual wastewater generated

D.

Ability to connect to existing wastewater infrastructure

Buy Now
Question # 30

A mixed-use project without transit service has the following characteristics:

* 55 townhomes on 9 acres (3.6 hectares) of buildable land

* 44.000 ft2 (4.088 m2) of commercial building on 87.120 ft2(9.094.m2) Of buildable land

What should be added to the development plan to meet the minimum density requirements for Neighborhood Pattern and Design Prerequisite Compact Development?

Options:

A.

Four dwelling units

B.

Eight dwelling units

C.

12.220 ft2(1.135 m2) of commercial space

D.

130.000 ft2 (12 077 m2) of commercial space

Buy Now
Question # 31

Winch of the following fixtures, fillings, or appliances Is outside the scope of water use reduction calculations in Green in Infrastructure and Buildings Credit. Indoor Water Use Reduction?

Options:

A.

Residential shower head

B.

Commercial dishwashers

C.

Residential and commercial toilets

D.

Kitchen sink foucels

Buy Now
Question # 32

A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?

Options:

A.

Light Pollution Reduction

B.

Renewable Energy Production

C.

infrastructure Energy Efficiency

D.

Optimize Building Energy Performance

Buy Now
Question # 33

The LEED for Neighborhood Development project learn is tabulating the potential number of points. What is the maximum number of points the team can earn through Regional Priority credits?

Options:

A.

Two points

B.

Four points

C.

Six points

D.

Eight points

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Jan 31, 2025
Questions: 100
LEED-AP-ND pdf

LEED-AP-ND PDF

$25.5  $84.99
LEED-AP-ND Engine

LEED-AP-ND Testing Engine

$28.5  $94.99
LEED-AP-ND PDF + Engine

LEED-AP-ND PDF + Testing Engine

$40.5  $134.99