Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-ND Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 14

A developer is trying to calculate it a property qualities as an adjacent site. When considering the bordering land alongthe property boundary, which ofthe following borders can be omitted from the calculation?

Options:

A.

A border along a lake

B.

A wetland bordering the site

C.

A public street or other right-of-way

D.

A bordering site that Is previously disturbed

Buy Now
Question # 15

A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

Options:

A.

Green Infrastructure and Buildings Credit. Heat Island Reduction

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Green Infrastructure and Buildings Credit. District Heating and Cooling

D.

Green Infrastructure and Buildings Credit. Infrastructure Energy Efficiency

Buy Now
Question # 16

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

Options:

A.

50%

B.

65%

C.

75%

D.

90%

Buy Now
Question # 17

On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

Options:

A.

Including a new middle school with a 12-acre (4.8 hectare) campus

B.

Including a new elementary school with a four-acre (1.6 hectare) campus

C.

Locating all of the units within a 1.5 mi (2414m) walking distance of an ousting high school

D.

Locating three units within a 1/2 mi. (800 m) walking distance, and seven units within a one ml. (1.600 m) walking distance of an existing elementary school

Buy Now
Question # 18

A brand new communityis being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or thefollowing may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?

Options:

A.

Schools

B.

Hospitals

C.

Multi-family buildings

D.

Single-family residences

Buy Now
Question # 19

A developer is considering purchasing a 400-acc (161 hectare) site which la currently zoned (or two dwelling units(DU) per sere (five DU/hectare).Which initial action during the entitlement process would help make the site eligible for LEED for NeighborhoodDevelopment certification?

Options:

A.

Create an overlay district

B.

Rezone the project for a higher density

C.

Build commercial uses around the development border

D.

Contact the Location and Planning Technical Advisory Group for initial review

Buy Now
Question # 20

A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

Options:

A.

One year

B.

Two years

C.

Three years

D.

Four years

Buy Now
Question # 21

For a LEED for Neighbor Hood Development project, an important starting point for project certification Is the formulation of overarching goals to guide the project team's work toward successful certification The LEED for Neighborhood Development Reference Guide identities three foundations for goal setting, in addition to the project’s environmental setting and community context, what is the third foundation?

Options:

A.

The projects timeline

B.

USGBC's mission

C.

Federal policy

D.

The developer’s mission

Buy Now
Question # 22

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

Options:

A.

special map.

B.

permit map.

C.

vicinity map

D.

project site map.

Buy Now
Question # 23

A developer is lookingfor a site to construct a LEED for Neighborhood Development project.Which contextual attribute would most contribute to gaining this certification?

Options:

A.

A site with waterfront as part of its boundary

B.

Previously disturbed land surrounding the site

C.

A nearby office park

D.

A load utility that supplies renewable energy to the site

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Jan 31, 2025
Questions: 100
LEED-AP-ND pdf

LEED-AP-ND PDF

$25.5  $84.99
LEED-AP-ND Engine

LEED-AP-ND Testing Engine

$28.5  $94.99
LEED-AP-ND PDF + Engine

LEED-AP-ND PDF + Testing Engine

$40.5  $134.99