Question # 4

In order for a building permit to be issued, what MUST be completed?

Options:

A.

demolition phase of project

B.

submission of contract documents

C.

final inspection by a building official

D.

issuance of the certificate of occupancy

Buy Now
Question # 5

The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

Options:

A.

mutual assent

B.

breach of contract

C.

contractual capacity

D.

designer responsible disclaimer

Buy Now
Question # 6

A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?

Options:

A.

Facility condition index (FCI)

B.

Building information modeling (BIM)

C.

Project life cycle management (PLM)

D.

Virtual design and construction project manager (VDC)

Buy Now
Question # 7

What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

Options:

A.

Work Flow

B.

Gantt Chart

C.

Critical Path Method (CPM)

D.

Program Evaluation Review Technique (PERT)

Buy Now
Question # 8

A client wants to remove the gypsum board from an existing structural column and leave it exposed. What implications might this have on the fire rating of the assembly?

Options:

A.

Reduce the fire rating of the assembly

B.

Increase the fire rating of the assembly

C.

There would be no change in the fire rating of the assembly

Buy Now
Question # 9

The client has approved a selection for lounge seating and has selected a COM fabric for its reception area. What should the designer do NEXT?

Options:

A.

Send the COM information to the furniture vendor for approval of the fabric application

B.

Produce a purchase order for the COM fabric, and send the fabric and the order to the manufacturer

C.

Prepare the specifications for the furniture and list the chairs, COM information, and quantity needed

D.

Reselect a fabric that closely resembles the selected COM fabric and is offered by the furniture vendor

Buy Now
Question # 10

What is the BEST way for a designer to determine whether the payment application of a contractor is consistent with the work completed to date?

Options:

A.

Request a breakdown of the pricing in the payment application to be reviewed by the consultants

B.

Participate in periodic site visits to compare progress onsite to progress claimed in the payment application

C.

Review the project schedule to determine what should be completed by the date of the payment application

D.

Call the subcontractors individually to verify that the work noted on the payment application is indeed complete

Buy Now
Question # 11

To reduce radon levels in a home, it is recommended that the

Options:

A.

crawl space is ventilated

B.

building is depressurized

C.

basement windows are sealed

D.

expansion joints are installed at slabs-on-grade

Buy Now
Question # 12

During demolition, the contractor discovers dry rot in some existing walls that are to remain. After reaching an agreement with the client and contractor on a solution, what should be issued before construction continues?

Options:

A.

a bulletin

B.

an addendum

C.

a change order

D.

a change directive

Buy Now
Question # 13

Which wall section provides for a two-hour fire-rated wall?

Options:

A.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] regular gypsum board applied to each side, 3/8" [9 mm] regular gypsum board applied to each side

B.

Two layers 1/2" [13 mm] metal studs, regular gypsum board applied to each side

C.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] type X gypsum board applied to each side, 1/4" [6 mm] regular gypsum board applied to each side, 2" [50 mm] glass fiber insulation

D.

1 5/8" [41 mm] metal studs, two layers 1/2" [13 mm] type X gypsum board applied to each side, glass fiber insulation

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 18, 2025
Questions: 175
IDPX pdf

IDPX PDF

$29.75  $84.99
IDPX Engine

IDPX Testing Engine

$33.25  $94.99
IDPX PDF + Engine

IDPX PDF + Testing Engine

$47.25  $134.99