Question # 34

A building owner hires a design firm to renovate an existing office suite into a live-work space. What is the FIRST step the designer should take?

Options:

A.

Perform a site visit

B.

Confirm zoning ordinance

C.

Document the project drivers

D.

Verify the building construction type

Buy Now
Question # 35

The role of the project manager includes

Options:

A.

selecting a project team, establishing and overseeing the budget, and coordinating withconsultants

B.

preparing preliminary designs, coordinating with consultants, and developing proposals and contracts

C.

serving as the primary client contact, developing proposals and contracts, and producing project specifications

D.

establishing and overseeing the budget, producing schematic designs, and serving as the primary client contact

Buy Now
Question # 36

In an existing non-sprinklered multi-tenant building, a client will be converting a suite from a bank into a restaurant serving more than 49 persons. What fire rating is REQUIRED between the new tenant and the existing adjacent insurance office?

Options:

A.

0

B.

1

C.

2

D.

3

Buy Now
Question # 37

Which of the following is often within a building’s management office with the purpose of locating the building’s smoke detection devices?

Options:

A.

electric panel

B.

annunciator panel

C.

backup power panel

D.

fire alarm manual pull station

Buy Now
Question # 38

Allowances are included in contract documents when

Options:

A.

the project is design-build

B.

final product selection is unknown

C.

more competitive bidding is desired

D.

a proprietary specification is provided

Buy Now
Question # 39

Why is corrective work completed post-occupancy often MORE costly for the contractor?

Options:

A.

The warranty has expired

B.

Progress payments are not included

C.

The work must be performed after hours

D.

Revisions are billed on a cost-plus basis

Buy Now
Question # 40

During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to

Options:

A.

issue a change order

B.

make an interpretation

C.

notify the owner of the discrepancy

D.

notify the designer of the discrepancy

Buy Now
Question # 41

The designer attends the weekly progress meetings and is responsible for the meeting minutes. How does the designer ensure that the minutes prepared are accurate?

Options:

A.

Issue a clause in the minutes indicating that minutes are approved and accepted as written

B.

Issue minutes including a clause stipulating minutes will be approved within 24 hours of issue

C.

Issue minutes including a clause enabling attendees to submit revisions within a specified time frame

D.

Issue draft minutes within 24 hours of the meeting, followed by final minutes within 72 hours of meeting completion

Buy Now
Question # 42

Which party is responsible for requesting inspections during construction of a project?

Options:

A.

owner

B.

designer

C.

sub-contractor

D.

general contractor

Buy Now
Question # 43

What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

Options:

A.

Reuse the existing doors and millwork where possible

B.

Save as many existing nonstructural walls as possible

C.

Maintain the existing water closet and lavatory locations

D.

Design an open-plan for each space without suspended ceilings

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 19, 2025
Questions: 175
IDPX pdf

IDPX PDF

$29.75  $84.99
IDPX Engine

IDPX Testing Engine

$33.25  $94.99
IDPX PDF + Engine

IDPX PDF + Testing Engine

$47.25  $134.99