Question # 14

What is the MINIMUM fire rating for a door in a 2-hour fire separation wall?

Options:

A.

3/4-hour

B.

1-hour

C.

1 1/2-hours

D.

2-hours

Buy Now
Question # 15

When developing a design, which BEST unifies the project and provides specific direction for the design?

Options:

A.

Feasibility studies

B.

Concept statement

C.

Space allocation studies

D.

Programming and research

Buy Now
Question # 16

What is the required clear floor space at an accessible lavatory in a public restroom (washroom)?

Options:

A.

24" x 42" [610 mm x 1067 mm]

B.

24" x 48" [610 mm x 1219 mm]

C.

30" x 36" [762 mm x 914 mm]

D.

30" x 48" [762 mm x 1219 mm]

Buy Now
Question # 17

A university is renovating the restrooms (washrooms) of a dormitory built in 1963 and is required to reduce the water usage by 20%. What is MOST important when specifying plumbing fixtures?

Options:

A.

durability & Green Seal fixtures

B.

cleanability & Energy Star fixtures

C.

accessibility & WaterSense fixtures

D.

sustainability & International Plumbing Code compliant fixtures

Buy Now
Question # 18

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Buy Now
Question # 19

Which project delivery method involves two separate contracts: one with the designer and one with the general contractor?

Options:

A.

design-build

B.

design-bid-build

C.

integrated project delivery

D.

construction management at risk

Buy Now
Question # 20

What is the MOST critical aspect of an existing building to check before locating library shelving and densely packed filing cabinets?

Options:

A.

Location of sprinkler lines and heads

B.

Location of columns and bearing walls

C.

Load-bearing capacity of the building’s floor system

D.

Access route from loading dock to the final location

Buy Now
Question # 21

The specification of which item is within the scope of work for interior designers when designing for water conservation?

Options:

A.

ultra-low flow faucets

B.

vegetated roof system

C.

rainwater collection cisterns

D.

FSC certified wood products

Buy Now
Question # 22

A post-occupancy evaluation indicates that occupants are cold during winter months due to the building’s HVAC system not performing according to design. What would have prevented this situation?

Options:

A.

commissioning

B.

additional diffusers

C.

a punch (deficiency) list

D.

an underfloor distribution system

Buy Now
Question # 23

A designer is hired to update a community clubhouse in a private residential subdivision. During the pre-design phase, the designer interviews stakeholders to gather information about the use of the clubhouse. Who is the MOST important stakeholder?

Options:

A.

HOA

B.

residents

C.

building manager

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 19, 2025