Before connecting, mounting and powering 213 total controller-based APs what action should be taken to ensure that they are configured by the controller once powered on and connected lo the network''
What factors are key features when designing a guest network for a large enterprise?(Choose all that apply.)
Response:
During the deployment of a WLAN the customer complains that the chosen locations for several APs are ruining the aesthetics of the building Instead of changing AP locations and requiring a redesign, what action can you recommend1?
After designing a WLAN infrastructure using predictive design software. What's the best way to validate the predictive design in the physical space before deployment, if time and budget allow for it?