Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

CWNP CWDP-304 Online Access

Page: 10 / 20
Question 40

After successfully deploying and validating a WLAN intra structure, who should be trained for a better understanding and management of the solution? (Choose the single best answer)

Options:

A.

Support staff and end-users

B.

CEOs and other executives

C.

Guests and CEOs

D.

WLAN designer and WLAN implemented

Question 41

What should always be done before connecting an AP to the production network?

Response:

Options:

A.

Baseline configuration that prevents the introduction of security issues to the network on initial connection.

B.

Disabling SSID broadcasting.

C.

Reduction of output power.

D.

Increase in output power.

Question 42

When designing a static channel plan for an office using voice devices near an airport, which range of channels should be avoided to ensure

optimal performance when implemented?

Options:

A.

36-40

B.

44-48

C.

116-124

D.

1-11

Question 43

The installation crew for your WLAN project wants to install a few APs to locations nearby the ones specified in the RF design document. What next step should occur?

Response:

Options:

A.

Confirm the mounting hardware.

B.

Choose a different AP model.

C.

Update the documentation.

D.

Consult the RF designer.

Page: 10 / 20
Exam Code: CWDP-304
Exam Name: Certified Wireless Design Professional
Last Update: Nov 21, 2024
Questions: 281
CWDP-304 pdf

CWDP-304 PDF

$28  $80
CWDP-304 Engine

CWDP-304 Testing Engine

$33.25  $95
CWDP-304 PDF + Engine

CWDP-304 PDF + Testing Engine

$45.5  $130