New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

PDF WELL-AP Study Guide

Page: 6 / 15
Question 24

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?

Options:

A.

10 height-adjustable work surfaces

B.

11 height-adjustable work surfaces

C.

12 height-adjustable work surfaces

D.

13 height adjustable work surfaces

Question 25

A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.

To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?

  • X-ray fluorescence (XRF)

  • Polarized light microscopy (PLM)

  • Transmission electron microscopy (TEM)

Options:

A.

NIOSH Manual of Analytical Methods (MNAM) Method 7400

Question 26

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Options:

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Question 27

A WELL Cote building project wishes to challenge the findings of a WELL report. Which of the following steps should the protect team take?

Options:

A.

Submit an appeal

B.

Submit for equivalency

C.

Submit for recertification

D.

Submit a curative action plan

Page: 6 / 15
Exam Code: WELL-AP
Exam Name: WELL Accredited Professional (WELL AP) Exam
Last Update: Dec 22, 2024
Questions: 204
WELL-AP pdf

WELL-AP PDF

$25.5  $84.99
WELL-AP Engine

WELL-AP Testing Engine

$28.5  $94.99
WELL-AP PDF + Engine

WELL-AP PDF + Testing Engine

$40.5  $134.99