A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?
A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project. Which strategy should the WELL AP use to ensure the requirements are met?
A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by
Which of the following chemicals can be added to the public water supply to act as a disinfectant?