Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Full Access Oracle 1z0-1075-24 Tutorials

Page: 2 / 3
Question 8

Your client has asked you to implement the functionality to ensure that the system checks for Qualified Operators when reporting labor usage.

Which statement is NOT true?

Options:

A.

Validation of operator qualification is also enforced when reporting operation is completed through the dispatch list.

B.

You will need to report a qualified operator to manually report resource transactions, if the resource has a job profile associated with It.

C.

Quick Complete is allowed for operations that contain resources with associated job profiles.

D.

Qualified labor must be reported at the resource train stop.

Question 9

You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.

Which setup task must you perform to achieve this?

Options:

A.

Deselect the Count Point check box while defining the standard operation.

B.

Select the Automatically Transact check box while defining the standard operation.

C.

Select the Count Point check box while defining the standard operation.

D.

Ensure that the Charge Type of the resource is Automatic.

Question 10

Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.

Which three statements are true when overriding the production calendar?

Options:

A.

The Work Execution Work Area Infolets and Manage Production Exceptions page are based on the plant calendar and not on work center calendars.

B.

While defining override calendars, you need to ensure that the date effective range for a work center calendar association can be overlapping and contiguous.

C.

Even if there are override calendars, the lead time calculation in days for an item remains based on the plant calendar and not on work center calendars.

D.

When the user executes search action in the Review Dispatch List page, if more than one work center are selected and if the start date or completion date is based on Shift-based search, then the operations are queried based on the shifts of the plant calendar only.

E.

Supplier operations used in outside processing use the work center calendar in work order scheduling.

Question 11

To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.

Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

Options:

A.

Work definition header and version attributes

B.

Descriptive flexfields (OFFs) at any level

C.

Item structure component attributes referenced from Product Information Management(PIM)

D.

Attachments at any level

E.

Operation resources. Including alternate resources

Page: 2 / 3
Full Access Oracle 1z0-1075-24 Tutorials, Manufacturing Cloud 1z0-1075-24 Release Date,
Exam Code: 1z0-1075-24
Exam Name: Oracle Manufacturing Cloud 2024 Implementation Professional
Last Update: Nov 24, 2024
Questions: 50
1z0-1075-24 pdf

1z0-1075-24 PDF

$25.5  $84.99
1z0-1075-24 Engine

1z0-1075-24 Testing Engine

$28.5  $94.99
1z0-1075-24 PDF + Engine

1z0-1075-24 PDF + Testing Engine

$40.5  $134.99