Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Foundation Level ISTQB-CTFL ISTQB Study Notes

Page: 6 / 21
Question 24

In maintenance testing, what is the relationship between impact analysis and regression testing?

Options:

A.

Impact analysis requires a regression testing for only the tests that have detected faults in previous SW release

B.

There is no relationship between impact analysis and regression testing.

C.

Impact analysis requires a regression testing for all program elements which were newly integrated (new functionalities).

D.

The impact analysis is used to evaluate the amount of regression testing to be performed.

Question 25

Given the following User Story: "As an online customer, I would like to be able to cancel the purchase of an individual item from a shopping list so that it only displays the relevant items, in less than 1 second", which of the following can be considered as applicable acceptance test cases?

I.Click on my online shopping list, select the unwanted Item, delete the unwanted item, the unwanted Item is deleted from the shopping list in less than 1 second.

ii.Click on my online shopping list, select all the items, delete all the items, the unwanted items are deleted from the shopping list in less than 1 second.

iii.Tab to the online shopping list and press enter, select the unwanted item, delete the unwanted item, the unwanted item is deleted from the shopping list In less than 1 second.

Iv. Click on the checkout button, select the payment method, make payment, confirmation received of payment and shipping date.

v. Click on my shopping list, select the unwanted Item, delete the unwanted item, the unwanted item is deleted from the shopping list.

Select the correct answer:

Options:

A.

I, ii and v

B.

iv

C.

i and iii

D.

v

Question 26

The whole-team approach:

Options:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

Question 27

Consider a given test plan which, among others, contains the following three sections: "Test Scope", "Testing Communication", and "Stakeholders". The features of the test object to be tested and those excluded from the testing represent information that is:

Options:

A.

not usually included in a test plan, and therefore in the given test plan it should not be specified neither within the three sections mentioned, nor within the others

B.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Test Scope" rather than in the other two sections mentioned

C.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Testing Communication" rather than in the other two sections mentioned

D.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Stakeholders" rather than in the other two sections mentioned

Page: 6 / 21
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL) v4.0
Last Update: Nov 21, 2024
Questions: 288
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$28  $80
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$33.25  $95
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$45.5  $130