New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

ISTQB-CTFL ISTQB Exam Lab Questions

Page: 3 / 21
Question 12

Which of the following answers describes a reason for adopting experience-based testing techniques?

Options:

A.

Experience-based test techniques provide more systematic coverage cnteria than black-box and white-box test techniques

B.

Experience-based test techniques completely rely on the tester's past experience for designing test cases.

C.

Experience-based test techniques allow designing test cases that are usually easier to reproduce than those designed with black-box and white-box test techniques.

D.

Experience-based test techniques tend to find defects that may be difficult to find with black-box and white-box test techniques and are often useful to complement these more systematic techniques.

Question 13

Which of the following about typical information found within a test plan is FALSE?

Options:

A.

The need to temporarily have additional test personnel available for specific test phases and/or test activities

B.

The conditions that must be met in order for the test execution activities to be considered completed.

C.

The list of the product risks which have not been fully mitigated at the end of test execution.

D.

The conditions that must be met for part of all the planned activities to be suspended and resumed.

Question 14

Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:

• most optimistic = 6 person hours

• most likely = 30 person hours

• most pessimistic = 54 person hours

Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?

Options:

A.

The final estimate is between 22 person hours and 38 person hours

B.

The final estimate is exactly 30 person hours because the technique uses the initial most likely estimate as the final estimate

C.

The final estimate is between 6 person hours and 54 person hours

D.

The final estimate is exactly 30 person hours because the technique uses the arithmetic mean of the three initial estimates as the final estimate

Question 15

Which of the following is a possible reason for introducing a defect in software code?

Options:

A.

Rushing to meet a tight deadline to turn code over for testing

B.

Improper unit testing

C.

Improper system testing

D.

Focus on static testing over dynamic testing

Page: 3 / 21
Exam Code: ISTQB-CTFL
Exam Name: ISTQB Certified Tester Foundation Level (CTFL) v4.0
Last Update: Dec 23, 2024
Questions: 288
ISTQB-CTFL pdf

ISTQB-CTFL PDF

$25.5  $84.99
ISTQB-CTFL Engine

ISTQB-CTFL Testing Engine

$28.5  $94.99
ISTQB-CTFL PDF + Engine

ISTQB-CTFL PDF + Testing Engine

$40.5  $134.99