Question 44

A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

Options:

A.

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level

Question 45

The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,

Light Pollution Reduction. Which interpretations must be used when attempting this credit?

Options:

A.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant

B.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's

registration date that the project thinks is relevant

C.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's

registration date that applies to the project's rating system

D.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the

project's registration date that applies to the project's rating system

Question 46

What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

Options:

A.

To achieve a daylight factor in all spaces

B.

To provide lighting controls for regularly occupied spaces

C.

To achieve direct line of site to vision glazing for all building occupants

D.

To provide a connection between building occupants and the outdoor environment

Question 47

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

Options:

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Page: 11 / 12
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Dec 27, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99