New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-O+M Reviews Questions

Page: 10 / 12
Question 40

One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must

Options:

A.

estimate the purchases of the other tenants and assume they are compliant in the Materials and Resources credit calculations

B.

estimate the purchases of the other tenants and assume they are noncompliant in the Materials and Resources credit calculations

C.

estimate the purchases of the other tenants and apply the compliance rate from LEED applicant in the Materials and Resources credit calculations

D.

exclude the purchases of the other tenants from the Materials and Resources credit calculations

Question 41

A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?

Options:

A.

550 lumens

B.

650 lumens

C.

1,500 lumens

D.

2,500 lumens

Question 42

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?

Options:

A.

Municipally supplied tap water

B.

Ground source stormwater runoff

C.

Air conditioner condensate

D.

Graywater from the building's hand-washing sinks

Question 43

What information is required when adding a new space within a facility to the ENERGY STAR® Portfolio Manager?

Options:

A.

Space floor area and hours of operation

B.

Number of workers and lighting power density

C.

Name of utility company and 12 months of energy use data

D.

Statement of energy performance and carbon emissions data

Page: 10 / 12
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Dec 27, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99