Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Free Access USGBC LEED-AP-O+M New Release

Page: 5 / 12
Question 20

A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs.

(680.4 kg) of wallboard. If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?

Options:

A.

70.4% of diversion

B.

71.8% of diversion

C.

75.7% of diversion

D.

82.3% of diversion

Question 21

What credit or prerequisite requires a plan for a hazardous spill cleanup?

Options:

A.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

B.

Materials and Resources Credit, Solid Waste Management - Ongoing

C.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

D.

Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

Question 22

How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?

Options:

A.

Local energy supplier estimates or calibrated energy simulation

B.

Historical energy consumption data or calibrated energy simulation

C.

Historical energy consumption data or national average source energy data

D.

Short-term system measurements using data loggers or national average source energy data

Question 23

According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

Options:

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Page: 5 / 12
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Nov 24, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99