New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

All LEED-AP-O+M Test Inside USGBC Questions

Page: 8 / 12
Question 32

What is the percentage range of total municipal waste that commercial and institutional buildings typically account

for?

Options:

A.

25% to 35%

B.

35% to 45%

C.

45% to 55%

D.

55% to 65%

Question 33

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

Options:

A.

Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction

B.

Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction

C.

The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction

D.

The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction

Question 34

A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance: Existing Buildings.

What program requirements apply?

Options:

A.

The project is already certified and it is not eligible

B.

The building is immediately eligible because of the previous certification

C.

The project needs to be occupied for one year prior to pursuing this certification

D.

The project needs to be occupied for two years prior to pursuing this certification

Question 35

At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Air speed and humidity

B.

Humidity and air temperature

C.

Air speed and air temperature

D.

Radiant temperature and air speed

Page: 8 / 12
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Dec 27, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$28.5  $94.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99