CPIM-8.0 Exam Dumps - APICS CPIM Questions and Answers

Question # 14

Which of the following actions hinders the transition from a push system to a pull system?

Options:

A.

Using standardized containers

B.

Using work orders as a backup

C.

Introducing kanban cards as authorization for material movement

D.

Maintaining a constant number of kanban cards during minor changes in the level of production

Buy Now
Question # 15

The time spent In queue by a specific manufacturing job is determined by which of the following factors related to the order?

Options:

A.

Lot size

B.

Priority

C.

Setup time

D.

Run time

Buy Now
Question # 16

One way to mitigate liability risk in the supply chain is to:

Options:

A.

negotiate lower component cost.

B.

require traceability for components.

C.

push inventory to supplier locations.

D.

use less-than-truckload (LTL) shipments more frequently.

Buy Now
Question # 17

In which of the following situations would you use an X-bar chart?

Options:

A.

Track the number of defects that are found in each unit.

B.

Measure the difference between the largest and the smallest in a sample.

C.

Determine the average value of a group of units.

D.

Estimate a subgroup variation.

Buy Now
Question # 18

In a lean environment, the batch-size decision for planning "A" items would be done by:

Options:

A.

least total cost.

B.

min-max system.

C.

lot-for-lot (L4L).

D.

periodic order quantity.

Buy Now
Question # 19

Which of the following planning modules considers the shortest-range planning goals?

Options:

A.

Capacity requirementsplanning(CRP)

B.

Input/output analysis

C.

Resource planning

D.

Rough-cut capacity planning (RCCP)

Buy Now
Question # 20

What priority control technique is most appropriate for a firm using a cellular production system?

Options:

A.

Shortest processing time (SPT) rule

B.

Distribution requirements planning (DRP)

C.

Pull production activity control (PAC)

D.

Push production activity control (PAC)

Buy Now
Question # 21

In Company XYZ, transaction-costing capability has been Integrated into the shop floor reporting system. A batch of 20 units was started in production. At the fourth operation, 20 units are reported as complete. At the fifth operation, 25 units are reported as complete. When all operations are complete, 20 units are checked into the stockroom. If the error at the fifth operation is undetected, which of the following conditions will be true?

Options:

A.

Stockroom inventory balance will be incorrect.

B.

Operator efficiency for the fifth operation will be overstated.

C.

Units in process will be understated.

D.

Work-in-process (WIP) cost will be understated.

Buy Now
Question # 22

Moving average forecasting methods are best when demand shows:

Options:

A.

a clear trend.

B.

high random variation.

C.

consistent seasonality.

D.

a cyclical pattern.

Buy Now
Question # 23

Which of the following situations is most likely to occur when using a push system?

Options:

A.

Work centers receive work even if capacity is not available.

B.

Work centers are scheduled using finite capacity planning.

C.

Work centers operate using decentralized control.

D.

Work centers signal previous work centers when they are ready for more work.

Buy Now
Exam Code: CPIM-8.0
Exam Name: Certified in Planning and Inventory Management (CPIM 8.0)
Last Update: Feb 2, 2025
Questions: 150
CPIM-8.0 pdf

CPIM-8.0 PDF

$29.75  $84.99
CPIM-8.0 Engine

CPIM-8.0 Testing Engine

$33.25  $94.99
CPIM-8.0 PDF + Engine

CPIM-8.0 PDF + Testing Engine

$47.25  $134.99