Question # 34

What is the primary role of quality personnel in a project?

Options:

A.

To manage the project's financial accounts

B.

To handle legal disputes related to the project

C.

To communicate project details with stakeholders

D.

To ensure compliance with regulatory standards

Buy Now
Question # 35

How should a Quality Manager best utilize customer complaint logs to capture both positive and negative feedback effectively?

Options:

A.

Use complaint logs that are focused on negative aspects to identify areas for improvement.

B.

Incorporate options in complaint logs for both criticisms and commendations.

C.

Use complaint logs for legal documentation, not for feedback.

D.

Restrict access to complaint logs to senior management.

Buy Now
Question # 36

How does ISO 14001 impact a construction project's quality management system?

Options:

A.

It integrates environmental management into quality practices.

B.

It incorporates quality management into all project phases.

C.

It ensures health and safety risks are taken into consideration.

D.

It adds risk-based thinking into the overall management approach.

Buy Now
Question # 37

Why would a Construction Quality Manager use a fault tree analysis (FTA) in a construction project?

Options:

A.

To systematically identify and map the root causes of a complex failure event

B.

To assess the overall cost efficiency of various construction processes

C.

To prioritize the most frequent but low-impact risks identified in the project

D.

To reduce the number of inspections by eliminating redundant quality checks

Buy Now
Question # 38

How should a construction quality manager handle design change requests (DCRs) that propose enhancements outside the original project scope?

Options:

A.

Approve the DCRs to meet the design team's preferences.

B.

Reject the DCRs to adhere to the original project scope and timeline.

C.

Evaluate the DCRs to ensure quality checks are identified.

D.

Allow the design team to make decisions on the DCRs.

Buy Now
Question # 39

What should an evaluation system prioritize to address compliance risks from evolving regulation requirements in a construction project?

Options:

A.

The ability to track regulatory changes and update procedures accordingly

B.

The thoroughness of compliance audits and the internal reporting of issues

C.

The frequency of inspections and the number of passed inspections

D.

A focus on reducing the likelihood of noncompliance penalties during the project

Buy Now
Question # 40

Establishing governance standards within a project quality plan is primarily aimed at

Options:

A.

reducing the cost of raw materials used in the project

B.

ensuring project activities are visible and ethical

C.

decreasing the frequency of quality audits

D.

simplifying the technical specifications for the project

Buy Now
Question # 41

How should the effectiveness of the post-occupancy care phase be evaluated in a construction project?

Options:

A.

By assessing the responsiveness and effectiveness of ongoing maintenance and support services in addressing occupant issues.

B.

By the number of follow-up meetings scheduled with the occupants to discuss building functionality and satisfaction.

C.

By correlating the increase in property value against the post-occupancy rate.

D.

By the level of occupant satisfaction with the building's aesthetics.

Buy Now
Question # 42

Conflicts that arise due to differing opinions among team members occurs during which of the following team development stages?

Options:

A.

Forming

B.

Storming

C.

Norming

D.

Performing

Buy Now
Question # 43

What is a primary benefit of applying value engineering during the design phase of a construction project?

Options:

A.

To achieve the best balance between cost, functionality, and quality

B.

To extend the project timeline by incorporating comprehensive reviews

C.

To focus on reducing the project budget at any cost

D.

To eliminate all non-essential design elements

Buy Now
Exam Code: CCQM
Exam Name: Certified Construction Quality Manager
Last Update: Apr 2, 2025
Questions: 165
CCQM pdf

CCQM PDF

$25.5  $84.99
CCQM Engine

CCQM Testing Engine

$28.5  $94.99
CCQM PDF + Engine

CCQM PDF + Testing Engine

$40.5  $134.99