Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

400-007 Exam Dumps - Cisco CCDE v3.0 Questions and Answers

Question # 34

A network design includes a long signaling delay in notifying the Layer 3 control plane that an interface has failed Which two of these actions would reduce that delay? (Choose two.)

Options:

A.

Increase network stability.

B.

Reduce the time for the network to reconverge.

C.

Increase the notification of interface flaps.

D.

Enable lower data link layer recovery systems to have an opportunity to restore the interface

Buy Now
Question # 35

Which issue poses a challenge for security architects who want end-to-end visibility of their networks?

Options:

A.

too many overlapping controls

B.

too many disparate solutions and technology silos

C.

an overabundance of manual processes

D.

a network security skills shortage

Buy Now
Question # 36

Which service abstracts away the management of the operating system, middleware, and runtime?

Options:

A.

laaS

B.

PaaS

C.

SaaS

D.

BMaaS

Buy Now
Question # 37

A large enterprise customer is planning a new WAN connection to its headquarters. The current architecture is

dual homed with static routing, but users complain when a specific link fails. Failure of the other link does not

affect any services or applications. The new WAN connection must provide the headquarters with a resilient

network design and increase the return on investment.

Which solution should be recommended to the customer?

Options:

A.

Implement granular quality of service on the links.

B.

Procure additional bandwidth.

C.

Use dynamic routing toward the WAN.

D.

Add an additional link to the WAN.

Buy Now
Question # 38

Company XYZ wants to use the FCAPS ISO standard for network management design. The focus of the design should be to monitor and keep track of any performance issues by continuously collecting and analyzing statistical information to monitor, correct, and optimize any reduced responsiveness across the network. Which layer accomplishes this design requirement?

Options:

A.

fault management

B.

accounting management

C.

performance management

D.

security management

Buy Now
Question # 39

SDWAN networks capitalize the usage of broadband Internet links over traditional MPLS links to offer more cost benefits to enterprise customers. However, due to the insecure nature of the public Internet, it is mandatory to use encryption of traffic between any two SDWAN edge devices installed behind NAT gateways. Which overlay method can provide optimal transport over unreliable underlay networks that are behind NAT gateways?

Options:

A.

TLS

B.

DTLS

C.

IPsec

D.

GRE

Buy Now
Question # 40

Two enterprise networks must be connected together. Both networks are using the same private IP addresses.

The client requests from both sides should be translated using hide NAT (dynamic NAT) with the overload

feature to save IF addresses from the NAT pools. Which design addresses this requirement using only one

Cisco I OS NAT router for both directions?

Options:

A.

This is not possible, because two Cisco IOS NAT routers are required to do dynamic NAT, with overload in

both directions.

B.

The ip nat inside and ip nat outside commands must be configured at the interfaces with the overload

option in both directions.

C.

The overload feature is the default and does not have to be configured.

D.

Two different NAT pools must be used for the ip nat inside source and the ip nat outside source commands

for the overload feature in both directions.

E.

The Nat Virtual interface must be used to achieve this requirement.

Buy Now
Question # 41

Which two points must network designers consider when designing a new network design or when evaluating an existing network design to help them understand the high-level design direction with regards to the security aspects? (Choose two)

Options:

A.

Consider Business objectives and goals

B.

Consider organization’s security policy standards

C.

Consider for only multi-site networks

D.

Consider for only new network technologies and components

Buy Now
Question # 42

Refer to the exhibit.

The WAN network of the General Bank of Greece has experienced several outages It takes too long to activate a new branch site The networking department of the bank plans to upgrade the legacy end-of-life WAN network with a new flexible manageable, and scalable in-house solution The number of branches will increase exponentially in the next fiscal year The CTO states that the bank’s mam goal is OPEX reduction The network engineering team prepares a table to evaluate the available options Which WAN technology can be used for the solution?

Options:

A.

DMVPN over L3VPN

B.

Managed SD-WAN

C.

SD-WAN over L3VPN

D.

SD-WAN over L2VPN

Buy Now
Question # 43

You are tasked to design a QoS policy for a service provider so they can include it in the design of their MPLS core network If the design must support an MPLS network with six classes, and CEs will be managed by the service provider, which QoS policy should be recommended?

Options:

A.

map IP CoS bits into the IP Precedence field

B.

map flow-label bits into the Exp field

C.

map IP precedence bits into the DSCP field

D.

map DSCP bits into the Exp field

Buy Now
Exam Code: 400-007
Exam Name: Cisco Certified Design Expert (CCDE v3.1)
Last Update: Apr 1, 2025
Questions: 381
400-007 pdf

400-007 PDF

$119.7  $399
400-007 Engine

400-007 Testing Engine

$134.7  $449
400-007 PDF + Engine

400-007 PDF + Testing Engine

$179.7  $599