(Select 2) When might Feature size not be a good substitute for the duration of WSJF?
If a Value Stream is bigger than the recommended ART size, SAFe recommends splitting it by development process steps and organizing the trains around those steps respectively.
Once an Epic is approved, an Epic Owner tracks the Epic through implementation.
A Program Epic that originates from a Portfolio Epic takes precedence over all local priorities on that train.
Multiple ARTs in a Value Stream typically require coordination at the Value Stream Level.
(Select 2) What are the ways to evolve the Solution Intent from variable to fixed scope?