Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

NCM-MCI-5.20 Exam Dumps - Nutanix NCM-MCI Questions and Answers

Question # 14

An administrator is currently using both 10g uplink with LACP and balance-tcp. A single VM should not be allowed to use more than a single 10G uplink, and both uplinks should be utilized.

Which two command should be used to configure the bond? (choose two)

Options:

A.

Ovs-vsctl set port br0-up bond_mode=balance-slb

B.

Ovs-vsctl set port br0-up bond_mode=balance-tcp

C.

Ovs-vsctl set port br0-up bond_mode=active-backup

D.

Ovs-vsctl set port br0-up other_config: bond-rebalance-interval=30000

Buy Now
Question # 15

Which Nutanix Product Provide S3-Compatible Storage?

Options:

A.

Volumes

B.

Files

C.

Objects

D.

Mine

Buy Now
Question # 16

An administrator needs to install prism central for their 2550 multi-cluster environment.

How should they deploy the application?

Options:

A.

Deploy a large 3-VM Prism Central instance

B.

Deploy a large 1-VM Prism Central instance.

C.

Deploy a small 3-VM Prism Central instance.

D.

Deploy a small 1-VM Prism Central instance.

Buy Now
Question # 17

A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms.

Which action should the administrator take to resolve the NCC errors?

Options:

A.

Replace the switch fabric extenders with 10G line rate switches

B.

Upgrade NCC and increase the CVM memory by 4Gb

C.

Add 2 additional 10G uplinks from the switch fabric extenders per node

D.

Upgrade NCC and increase the vCPU of the CVM

Buy Now
Question # 18

An administrator is configuring software only. Data-at-Rest Encryption on their Nutanix cluster. They are planning to deploy a third-party key management server (KMS).

Where should this server be hosted?

Options:

A.

As a single VM on the Nutanix cluster

B.

On hardware external to the Nutanix duster

C.

As a clustered VM setup on the Nutanix cluster

D.

As a single VM deployed on the host that contains the Prism leader CVM

Buy Now
Question # 19

An administrator is creating a Protection Domain to back up multiple application environments.

Which mechanism does Nutanix use to aggregate VMs with common backup and restore objectives?

Options:

A.

Application Pools

B.

Policy-based Backups

C.

Consistency Groups

D.

Availability Domains

Buy Now
Question # 20

An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?

Options:

A.

Enable Nutanix Flow at the Prism Central Level

B.

Manually disable CVM network Segmentation

C.

Convert storage only nodes into vSphere nodes

D.

Enable Jumbo Frames to accommodate network frames

Buy Now
Question # 21

Refer to the exhibit.

An administrator logged into Prism Element, notices the following in the home dashboard, and showing the exhibit.

Which action should the administrator take next?

Options:

A.

Configure the fqdn for the hosts indicated

B.

Troubleshoot the zookeeper server issue

C.

Re-run NCC specifying data_resiliency_check

D.

Check the hardware page for disk failures

Buy Now
Question # 22

Refer to the exhibit.

Based on the exhibit, What can be definitively determined about host DEMO-AHV-2

Options:

A.

The System Memory is undersized

B.

It is hosting a higher Quantity of VMs than the other nodes

C.

it has performed more on disk lookups than the other nodes

D.

It's cache is undersized compared to the other nodes

Buy Now
Question # 23

A customer has the following requirement for a Nutanix cluster:

  • Must support high-performance Nutanix Volumes iSCSI workloads
  • Must utilize AHV nodes
  • Must use 10 GbE interface

How should the customer optimize networking?

Options:

A.

Enable Jumbo Frame on just the Host

B.

Convert Cluster to ESXi and enable Jumbo Frame on Host and CVM

C.

Enable Jumbo Frames on just the CVM

D.

Enable the use of Jumbo Frame on Host and CVM

Buy Now
Exam Code: NCM-MCI-5.20
Exam Name: Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) 5.20
Last Update: Feb 22, 2025
Questions: 167
NCM-MCI-5.20 pdf

NCM-MCI-5.20 PDF

$25.5  $84.99
NCM-MCI-5.20 Engine

NCM-MCI-5.20 Testing Engine

$28.5  $94.99
NCM-MCI-5.20 PDF + Engine

NCM-MCI-5.20 PDF + Testing Engine

$40.5  $134.99