New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

HPE0-S59 Exam Dumps - HPE Technical Certification Questions and Answers

Page: 1 / 7
Questions 4

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

Options:

A.

Existing 2-port FLM modules must be replaced with 4-port FLM modules

B.

A management ring can contain mixed frame link module configurations

C.

A management ring with mixed FLM modules cannot have more than 12 frames

D.

Mixing different FLM modules is allowed if all of them have the same firmware version

Buy Now
Questions 5

You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.

What is required from the VMware side to enable LAG?

Options:

A.

Virtual Distributed Switch

B.

vSphere Standard license

C.

Load balancing cluster

D.

Dedicated VMKernel port

Buy Now
Questions 6

What is a restriction of using a RoCE network?

Options:

A.

This network type does not support sFlow and remote port monitoring.

B.

This network type does not support the smart link and private network features.

C.

This network type is not supported with HPE Virtual Connect SE 100Gb F8 Module for HPE Synergy.

D.

This network type by default is configured as untagged network and cannot be a part of a network set.

Buy Now
Questions 7

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Options:

A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Buy Now
Page: 1 / 7
Exam Code: HPE0-S59
Exam Name: HPE Compute Solutions
Last Update: Dec 22, 2024
Questions: 104
HPE0-S59 pdf

HPE0-S59 PDF

$25.5  $84.99
HPE0-S59 Engine

HPE0-S59 Testing Engine

$28.5  $94.99
HPE0-S59 PDF + Engine

HPE0-S59 PDF + Testing Engine

$40.5  $134.99