Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

HPE0-S59 Exam Dumps - HPE Technical Certification Questions and Answers

Question # 24

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

Options:

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Buy Now
Question # 25

After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.

Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

Options:

Buy Now
Question # 26

A junior architect designed a solution based on HPE Synergy that must meet the following requirements:

    Support at least 30 HPE Synergy 480 Gen10 Plus compute modules

    Interconnect modules must provide MAC and WWN virtualization

    All HPE Synergy frames must formulate a single management entity

    The management appliance should not be a single point of failure

    Connectivity to FC array should be available to all compute nodesThe proposal consists of:

    3 HPE Synergy 12000 frames

    6 HPE Composer 2 modules

    2 HPE Virtual Connect SE 100Gb F32 Module

    4 HPE Synergy 50Gb Interconnect Link ModuleWhich statements about this proposed design are true? (Select two)

Options:

A.

FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.

C.

Remove 4 HPE Composer 2 modules from the design, as they are not required.

D.

The selected interconnect modules do not provide the requested WWN virtualization.

E.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.

Buy Now
Question # 27

You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?

Options:

A.

All physical interconnects from affected logical interconnects will be placed in a maintenance mode

B.

All physical interconnects from the affected logical interconnects must he rebooted to activate the new configuration

C.

All logical interconnects configured using this logical Interconnect group will report inconsistency

D.

All logical interconnects configured using this logical interconnect group will be automatically updated

Buy Now
Question # 28

Put the steps of the HPE infosight flow in the correct order.

Options:

Buy Now
Question # 29

Match each HPE Synergy logical component with the definition.

Options:

Buy Now
Question # 30

Match HPE SimpliVity team with the definition.

Options:

Buy Now
Question # 31

Click the option that will allow you to create an OS Deployment Plan with customized kickstart.

Options:

Buy Now
Question # 32

Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex 280 They plan to manage new components using HPE OneView

What must be done to achieve this goal?

Options:

A.

The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView

B.

The customer should deploy an HPE OneView appliance for HPE Superdome Flex management

C.

The customer must add a second Rack Management Controller for HPE Superdome Flex 280

D.

The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy

Buy Now
Question # 33

Refer to the exhibit.

Which statement about this logical interconnect group is true?

Options:

A.

Both modules are located in different frames for redundancy

B.

For an uplink set, ports from different modules can be selected

C.

interconnect modules are installed in interconnect bays 1 and 4

D.

An additional license is required to change the enclosure count

Buy Now
Exam Code: HPE0-S59
Exam Name: HPE Compute Solutions
Last Update: Mar 31, 2025
Questions: 104
HPE0-S59 pdf

HPE0-S59 PDF

$25.5  $84.99
HPE0-S59 Engine

HPE0-S59 Testing Engine

$28.5  $94.99
HPE0-S59 PDF + Engine

HPE0-S59 PDF + Testing Engine

$40.5  $134.99