In a school dormitory scenario, WLAN needs to be deployed. The customer proposes to maximize the bandwidth. Which of the following methods can best meet the needs of customers?
The fixed length feeder used by AP9330DN has 5m/10m/15m/20m specifications. If it exceeds 20m, it needs to be cut according to the actual situation.
The right length.
A park needs to achieve full coverage of WLAN. The length and width of the park is 100m×100m. There are clamps that can be installed in the middle. The capacity requirements are lower. Which of the following?
Which antenna is best for the above scenario?
What type of radio frame is used when the AP performs a counteraction against an illegal terminal?
Which of the following wireless applications has higher bandwidth and real-time requirements?
Which of the following is the correct description of the steps for working with the WLAN Tester 2.0 tool?
Which of the following options are the principles for engineers to deploy APs?
The following is true about the WLAN actual site survey in the trace (network cable or fiber), power supply is correct?