Which of the following is FALSE about the specific goal 1 Align Test Measurement and Analysis Activities in process area 4.1 Test Measurement?
A test process assessment has been performed at an embedded software organization. All process areas at TMMi Levels 2 and 3 were in scope of the assessment. Many practices required by the TMMi model are already in place, but the organization is missing a master test plan spanning multiple test levels.
Which of the following process areas would most likely need specific attention to address the above-mentioned shortcoming?
Which of the following is an Agile technique that can be applied as a way to establish test estimates (SG3) in the context of the Test Planning process area?
Consider the following characteristics of an assessment:
* the assessment is performed by an accredited TMMi assessor.
* only interviews are used as evidence.
To which type of assessment do these characteristics relate?