Question 20

Test Planning is defined as one of the process areas at TMMi level 2. It introduces practices such as product risk assessment and defining a test approach for the project. Process areas at higher TMMi levels build on these practices and also address product risk assessments and/or defining a test approach.

Which of the following TMMi level 3 process areas most strongly built on the practices and experiences of Test Planning at TMMi level 2?

1) Test Organization

2) Test Life Cycle and Integration

3) Non-Functional Testing

4) Peer Reviews

Options:

A.

1 and 4

B.

3 and 4

C.

2 and 3

D.

1 and 2

Question 21

Which of the following statements BEST describes a relationship between the TMMi model and the CMMI process areas Verification and Validation?

Options:

A.

CMMI process areas Verification and Validation are supporting process areas for the testing processes within the TMMi.

B.

The CMMI process areas Verification and Validation are process areas that should be addressed in parallel with the testing processes within the TMMi.

C.

The TMMi process areas provide support and a more detailed description of what is required to establish a defined Verification and defined Validation process.

D.

Achieving TMMi level 2 also ensures full compliance to the requirements of CMMI process areas Verification and Validation.

Question 22

Which of the following are valid reasons to perform a TMMi assessment?

1) Evaluate the performance of testers

2) Find areas to need to be improved

3) Determine which accomplishments have been made

4) As a basis to become formally TMMi certified

Options:

A.

1, 2 and 3

B.

1, 2 and 4

C.

1, 3 and 4

D.

2, 3 and 4

Question 23

Which of the following are specific goals of maturity level 4 process area Advanced Reviews?

1. Coordinate the peer review approach with the dynamic test approach

2. Perform peer reviews

3. Adjust the test approach based on review results early in the life cycle

4. Establish test performance indicators

5. Testing is performed using statistical methods

Options:

A.

1, 3, 5

B.

1 and 3

C.

2, 3, 4

D.

2, 4, 5

Page: 5 / 8
Exam Code: TMMi-P_Syll2.1
Exam Name: TMMi Test Maturity Model Integration Professional (TMMi-P)
Last Update: Dec 21, 2024
Questions: 111
TMMi-P_Syll2.1 pdf

TMMi-P_Syll2.1 PDF

$25.5  $84.99
TMMi-P_Syll2.1 Engine

TMMi-P_Syll2.1 Testing Engine

$28.5  $94.99
TMMi-P_Syll2.1 PDF + Engine

TMMi-P_Syll2.1 PDF + Testing Engine

$40.5  $134.99