What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?
An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?
A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?
A developer is trying to calculate it a property qualities as an adjacent site. When considering the bordering land alongthe property boundary, which ofthe following borders can be omitted from the calculation?