Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Last Attempt NCS-Core Questions

Page: 10 / 22
Question 40

A consultant is running operational verifications to validate cluster behaviors

What will happen if one power supply is disconnected from a NX-3235-G9 chassis?

Options:

A.

The hardware status is updated to reflect the change in Prism Element, the hosts continues to run, but VMHA has started securing workloads by moving them to other nodes.

B.

The hardware status updates to reflect the change in Prism Element, the hosts continues to run, and the Host hardware power status alert is sent There is no impact on workloads.

C.

The hosts appears disconnected in Prism Element and VMs are restarting on the other hosts.

D.

The hosts appears disconnected in vCenter and VMs are restarting on the other hosts.

Question 41

Refer to the exhibit.

A consultant is installing AOS 5.10 and ESXi 6.5 on three nodes. During the Foundation process, ESXi 6.5 is not available as one of the choices for hypervisor.

Which solution should the consultant use?

Options:

A.

Upload ESXi image to /home/Nutanix/foundation/nos/hypervisor/esx.

B.

Restart Foundation VM and refresh Foundation page.

C.

Update the Foundation whitelist from the support portal.

D.

Upload ESXi image to /home/Nutanix/foundation/isos/hypervisor/esx.

Question 42

An administrator needs to configure snapshots for DR scenarios. The databases get refreshed on Friday nights regularly. The search service application re-indexes the new application on Saturday nights regularly. The remaining front-end and middle tier VMs are static but do get minor version updates weekly.

The administrator needs to have 2 weeks of daily snapshots for all the VMs in an app group and 2 weeks application consist local snapshots only on Fridays, Saturdays and Sundays on the same group of VMs.

Which two options should the administrator use to configure snapshots?

Options:

A.

Create a schedule in a protection domain for all applicable VMs to snap daily with application consistency enabled with 6 days of retention and with no application consistency and 14 days local retention.

B.

Create two consistency groups in a protection domain, one for front-end and middle tier apps with no application consistency, one for database and Search apps with application consistency, and apply the correct schedule to both groups.

C.

Create one protection domain for all VMs in an application group with scheduled daily non-application consistent snapshots and another protection domain for all VMs in an application group with scheduled Friday. Saturday, Sunday application consistent snapshots.

D.

Create a protection domain for all VMs

Question 43

During Foundation using a customer-provided network switch, a consultant is facing time-out issues.

What action should the consultant take to resolve this issue?

Options:

A.

Check jumbo frames support of the network switch.

B.

Ensure the firmware of network switch is updated.

C.

Enable queue depth on ports connected to nodes.

D.

Disable STP on ports connected to Nutanix nodes.

Page: 10 / 22
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional
Last Update: Nov 23, 2024
Questions: 302
NCS-Core pdf

NCS-Core PDF

$25.5  $84.99
NCS-Core Engine

NCS-Core Testing Engine

$28.5  $94.99
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$40.5  $134.99