Question 68

A consultant is planning to use a flat switch for installation.

What is the network requirement for Foundation VM, CVM, Hypervisor, and IPMI

Options:

A.

Foundation VM, CVM, and Hypervisor must be on the same subnet. IPMI can be on a different subnet.

B.

CVM, Hypervisor, and IPMI must be on the same subnet. Foundation VM can be on a different subnet.

C.

Foundation VM and CVM must be on the same subnet. Hypervisor and IPMI can be on a different subnet.

D.

Foundation VM, CVM, and IPMI must be on the same subnet. Hypervisor can be on a different subnet.

Question 69

A consultant deploys a new ESXi-based Nutanix cluster and migrates a sphere deployment to the cluster, After completing the deployment, the customer states they are experiencing VM performance issues.

Upon observing logs and performance data, the consultant identified the following symptoms.

◦ Excessive read/write 1/Os on CVMs

◦ Excessive Motion of VMs

What is causing this issue?

Options:

A.

Sphere cluster DRS migration threshold is set to Conservative.

B.

DRS is in use and the cluster is configured to use Erasure Coding.

C.

DRS is in use and the cluster is configured to use Deduplication.

D.

Sphere cluster DRS migration threshold is set to Aggressive

Question 70

Refer to the exhibit.

On a four-node NX-3460 cluster, two 10G NiCs are connected to redundant Cisco ToR 5K switches as shown in the first exhibit Port On a four-node NX-3460 cluster, two 10G NICs are connected to redundant Cisco TOR Sk switches as shown in the fist exthibt. Port failover must be tested.

The network configuration output from the CVM is shown in the second exhibit. To test fallover, a shut command is executed on the switchport that connects the node to the 5k1 switch.

Refer to the exhibit.

Options:

A.

Active link is disconnected. Passive link takes over.

B.

Passive link is disconnected. Active link takes over.

C.

Active link takes over. HA Failover takes place.

D.

Passive link takes over. HA Failover takes place.

Question 71

For several days, an administrator notices the following alerts:

• CVM NIC Speed Low Warning Alerts

• Warning Alerts of CVM NIC not performing at optimal speed

• CVM is disconnected from the network Critical Alert

• Network Visualization page shows excessive dropped packets on CVM/Host

Which steps should be taken to determine which problem should be addressed first?

Options:

A.

• Access the Hardware Page to verify resources are available

• Analyze ail CVM Speed Alerts in the Alerts/Events page

• Analyze output for the network and interface properties and connectivity issues

B.

• Verify Host/CVM connectivity on the Network Visualization page

• Use to verify the bridge and bond configuration

• Review alerts/events page for the CVM disconnected error

C.

• Review Alerts page for NIC speed alerts and alert timing

• Analyze the genesis.out log file for process failures

• Assess the NIC properties in the Network Visualization > Host Properties page

D.

• Restart networking services on the CVM

• Determine the current configuration of the affected CVM via output

• Access the Alerts/Events page for the CVM network connection failures

Page: 17 / 22
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional
Last Update: Nov 23, 2024
Questions: 302
NCS-Core pdf

NCS-Core PDF

$25.5  $84.99
NCS-Core Engine

NCS-Core Testing Engine

$28.5  $94.99
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$40.5  $134.99